Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Natural Almonds
NAICS 311911: Roasted Nuts and Peanut Butter Manufacturing
SIC 2068: Salted and Roasted Nuts and Seeds
Sales Range $50
M
to 100
M
# of Employees 1
Plant Area 320,000
ft2
Annual Production 105,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $603,610 4,410,618
kWh
Electricity Demand $229,256 12,979
kW-mo/yr
LPG $402,016 25,728
MMBtu
TOTAL YEARLY COSTS $1,234,882
RECOMMENDED SAVINGS* $337,992 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,092 - $9,972
72,844
kWh
- - $(-880.0) -
02 2.4239: Eliminate or reduce compressed air usage $3,116 $220 $1,253
9,150
kWh
$1,863
-
kW-mo/yr
- - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,578 - - - $3,328
-
MMBtu
$(-750.0) -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,258 $6,264 $11,258
82,233
kWh
- - - -
05 2.7224: Reduce space conditioning during non-working hours $5,987 $5,606 $5,987
43,734
kWh
- - - -
06 2.2511: Insulate bare equipment $38,998 $38,922 - - $38,998
-
MMBtu
- -
07 2.6231: Utilize controls to operate equipment only when needed $1,544 $4,130 $1,544
11,280
kWh
- - - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,383 $49,958 $16,383
119,669
kWh
- - - -
09 2.7124: Make a practice of turning off lights when not needed $788 $2,785 $624
4,562
kWh
- - $67 $97
10 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $6,422 $29,062 - - $6,422
-
MMBtu
- -
11 2.9114: Use solar heat to make electricty $241,826 $1,576,614 $241,826
1,783,014
kWh
- - - -
TOTAL RECOMMENDED $337,992 $1,713,561 $288,847
2,126,486
kWh
$1,863
-
kW-mo/yr
$48,748
-
MMBtu
$(-1,563.0) $97
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs