ITAC Assessment: UL2602
ITAC logo
ITAC Assessment: UL2602
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product fried snacks
NAICS 311919: Other Snack Food Manufacturing
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 131,000
ft2
Annual Production 10,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $271,605 5,376,495
kWh
Electricity Demand $332,208 12,005
kW-mo/yr
Electricity Fees $19,942 -
Natural Gas $337,518 63,563
MMBtu
TOTAL YEARLY COSTS $961,273
RECOMMENDED SAVINGS* $116,343 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,840 $1,337 $6,840
135,437
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $6,663 - $6,663
131,932
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,036 $16,250 $3,036
60,095
kWh
- -
04 2.2136: Install / repair insulation on steam lines $5,603 $2,318 - - $5,603
-
MMBtu
05 2.2437: Recover waste heat from equipment $26,375 $80,000 - - $26,375
-
MMBtu
06 2.9114: Use solar heat to make electricty $45,457 $471,029 $22,913
458,262
kWh
$22,544
-
kW-mo/yr
-
07 2.2437: Recover waste heat from equipment $22,369 $25,000 - - $22,369
-
MMBtu
TOTAL RECOMMENDED $116,343 $595,934 $39,452
785,726
kWh
$22,544
-
kW-mo/yr
$54,347
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs