Assessment Year | 2002 |
---|---|
Principal Product | Plastic Film Products |
NAICS |
n/a
|
SIC | 3082: Unsupported Plastics Profile Shapes |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
225,000
ft2
|
Annual Production | 18,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $289,988 | 10,044,960 |
kWh
|
$0.029 |
Electricity Demand | $149,206 | 21,552 |
kW-mo/yr
|
$6.92 |
Natural Gas | $77,410 | 18,054 |
MMBtu
|
$4.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $35,519 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,685 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,847 | $866 |
$2,015
69,960
kWh
|
$832
-
kW-mo/yr
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,497 | $100 |
$1,019
35,391
kWh
|
$478
-
kW-mo/yr
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $114 | $17 |
$48
1,664
kWh
|
$66
-
kW-mo/yr
|
- | |
04 | 2.4239: Eliminate or reduce compressed air usage | $532 | $400 |
$532
18,467
kWh
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $975 | $1,200 | - | - |
$975
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,617 | - |
$5,739
199,278
kWh
|
$1,878
-
kW-mo/yr
|
- | |
07 | 2.7135: Install occupancy sensors | $309 | $600 |
$309
10,746
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,112 | $11,834 |
$4,085
141,832
kWh
|
$2,027
-
kW-mo/yr
|
- | |
09 | 2.4133: Use most efficient type of electric motors | $1,426 | - |
$1,072
37,232
kWh
|
$354
-
kW-mo/yr
|
- | |
10 | 2.6232: Install set-back timers | $101 | $197 |
$101
3,494
kWh
|
- | - | |
11 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $13,904 | $4,000 |
$11,208
389,169
kWh
|
$2,696
-
kW-mo/yr
|
- | |
12 | 2.2511: Insulate bare equipment | $85 | $180 |
$85
2,957
kWh
|
- | - | |
TOTAL RECOMMENDED | $35,519 | $19,394 |
$26,213
910,190
kWh
|
$8,331
-
kW-mo/yr
|
$975
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,685 | $13,094 |
$7,406
257,139
kWh
|
$3,279
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs