| Assessment Year | 1992 |
|---|---|
| Principal Product | MOLDED & EXTRUDED TEFLON |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 165 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $210,795 | 3,501,759 |
kWh
|
$0.060 |
| Natural Gas | $2,112 | 429 |
MMBtu
|
$4.92 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $8,168 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,793 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,980 | $420 |
$1,980
77,960
kWh
|
- | - | |
| 02 | 2.8123: Pay utility bills on time | $1,768 | - |
$1,768
-
kWh
|
- | - | |
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,230 | $3,386 |
$2,460
58,617
kWh
|
$(-1,230.0)
-
MMBtu
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,929 | - |
$2,094
21,102
kWh
|
- | $(-165.0) | |
| 05 | 2.4133: Use most efficient type of electric motors | $746 | $640 |
$746
13,189
kWh
|
- | - | |
| 06 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $215 | $215 |
$215
8,206
kWh
|
- | - | |
| 07 | 2.8121: Apply for tax-free status for energy purchases | $160 | $360 | - |
$160
-
MMBtu
|
- | |
| 08 | 2.6231: Utilize controls to operate equipment only when needed | $140 | $120 |
$140
5,569
kWh
|
- | - | |
| TOTAL RECOMMENDED | $8,168 | $5,141 |
$9,403
184,643
kWh
|
$(-1,070.0)
-
MMBtu
|
$(-165.0) | ||
| TOTAL IMPLEMENTED | $7,793 | $4,566 |
$9,188
176,437
kWh
|
$(-1,230.0)
-
MMBtu
|
$(-165.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs