ITAC Assessment: AM0153
ITAC logo
ITAC Assessment: AM0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product MOLDED & EXTRUDED TEFLON
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,795 3,501,759
kWh
Natural Gas $2,112 429
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,168 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,793

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,980 $420 $1,980
77,960
kWh
- -
02 2.8123: Pay utility bills on time $1,768 - $1,768
-
kWh
- -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,230 $3,386 $2,460
58,617
kWh
$(-1,230.0)
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,929 - $2,094
21,102
kWh
- $(-165.0)
05 2.4133: Use most efficient type of electric motors $746 $640 $746
13,189
kWh
- -
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $215 $215 $215
8,206
kWh
- -
07 2.8121: Apply for tax-free status for energy purchases $160 $360 - $160
-
MMBtu
-
08 2.6231: Utilize controls to operate equipment only when needed $140 $120 $140
5,569
kWh
- -
TOTAL RECOMMENDED $8,168 $5,141 $9,403
184,643
kWh
$(-1,070.0)
-
MMBtu
$(-165.0)
TOTAL IMPLEMENTED $7,793 $4,566 $9,188
176,437
kWh
$(-1,230.0)
-
MMBtu
$(-165.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs