Assessment Year | 2012 |
---|---|
Principal Product | Pedestrian Bridges |
NAICS | 336999: All Other Transportation Equipment Manufacturing |
SIC | 3799: Transportation Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
160,000
ft2
|
Annual Production | 160,000
units
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $204,553 | 1,788,772 |
kWh
|
$0.11 |
Natural Gas | $37,569 | 3,390 |
MMBtu
|
$11.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $171,242 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,062 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $7,437 | $680 |
$2,307
20,172
kWh
|
$5,130
-
MMBtu
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,625 | $200 |
$2,625
23,026
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,506 | $1,550 |
$2,506
21,986
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $34,674 | $51,251 |
$34,674
303,226
kWh
|
- | - | |
05 | 4.652: Replace existing equipment with more suitable substitutes | $124,000 | $150,000 | - | - | $124,000 | |
TOTAL RECOMMENDED | $171,242 | $203,681 |
$42,112
368,410
kWh
|
$5,130
-
MMBtu
|
$124,000 | ||
TOTAL IMPLEMENTED | $10,062 | $880 |
$4,932
43,198
kWh
|
$5,130
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs