ITAC Assessment: UA0089
ITAC logo
ITAC Assessment: UA0089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Pedestrian Bridges
NAICS 336999: All Other Transportation Equipment Manufacturing
SIC 3799: Transportation Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 160,000
ft2
Annual Production 160,000
units
Production Hrs. Annual 3,120
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $204,553 1,788,772
kWh
Natural Gas $37,569 3,390
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $171,242 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,062

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7261: Install timers and/or thermostats $7,437 $680 $2,307
20,172
kWh
$5,130
-
MMBtu
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,625 $200 $2,625
23,026
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,506 $1,550 $2,506
21,986
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $34,674 $51,251 $34,674
303,226
kWh
- -
05 4.652: Replace existing equipment with more suitable substitutes $124,000 $150,000 - - $124,000
TOTAL RECOMMENDED $171,242 $203,681 $42,112
368,410
kWh
$5,130
-
MMBtu
$124,000
TOTAL IMPLEMENTED $10,062 $880 $4,932
43,198
kWh
$5,130
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs