| Assessment Year | 2017 |
|---|---|
| Principal Product | Plastic parts |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
130,000
ft2
|
| Annual Production | 30,000,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $307,864 | 5,274,795 |
kWh
|
$0.058 |
| Electricity Demand | $50,754 | 11,712 |
kW-mo/yr
|
$4.33 |
| Natural Gas | $15,018 | 1,727 |
MMBtu
|
$8.70 |
| TOTAL YEARLY COSTS | $373,636 | |||
| RECOMMENDED SAVINGS* | $48,604 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,863 | $21,299 |
$8,710
149,150
kWh
|
$1,754
-
kW-mo/yr
|
- | $1,399 | |
| 02 | 2.7135: Install occupancy sensors | $184 | $300 |
$184
3,150
kWh
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,747 | $200 |
$1,696
29,040
kWh
|
$251
-
kW-mo/yr
|
$(-100.0) | $(-100.0) | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $429 | $420 |
$429
7,350
kWh
|
- | - | - | |
| 05 | 2.2511: Insulate bare equipment | $831 | $3,467 |
$831
14,224
kWh
|
- | - | - | |
| 06 | 2.8114: Change rate schedules or other changes in utility service | $25,338 | $500 |
$25,338
-
kWh
|
- | - | - | |
| 07 | 2.4151: Develop a repair/replace policy | $8,212 | $14,854 |
$7,151
122,455
kWh
|
$1,061
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $48,604 | $41,040 |
$44,339
325,369
kWh
|
$3,066
-
kW-mo/yr
|
$(-100.0) | $1,299 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs