ITAC Assessment: NC0602
ITAC logo
ITAC Assessment: NC0602
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Plastic parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 130,000
ft2
Annual Production 30,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $307,864 5,274,795
kWh
Electricity Demand $50,754 11,712
kW-mo/yr
Natural Gas $15,018 1,727
MMBtu
TOTAL YEARLY COSTS $373,636
RECOMMENDED SAVINGS* $48,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,863 $21,299 $8,710
149,150
kWh
$1,754
-
kW-mo/yr
- $1,399
02 2.7135: Install occupancy sensors $184 $300 $184
3,150
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,747 $200 $1,696
29,040
kWh
$251
-
kW-mo/yr
$(-100.0) $(-100.0)
04 2.4239: Eliminate or reduce compressed air usage $429 $420 $429
7,350
kWh
- - -
05 2.2511: Insulate bare equipment $831 $3,467 $831
14,224
kWh
- - -
06 2.8114: Change rate schedules or other changes in utility service $25,338 $500 $25,338
-
kWh
- - -
07 2.4151: Develop a repair/replace policy $8,212 $14,854 $7,151
122,455
kWh
$1,061
-
kW-mo/yr
- -
TOTAL RECOMMENDED $48,604 $41,040 $44,339
325,369
kWh
$3,066
-
kW-mo/yr
$(-100.0) $1,299
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs