ITAC Assessment: ST0017
ITAC logo
ITAC Assessment: ST0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product POINT OF PURCH. DISPLAYS
NAICS
n/a
SIC 3993: Signs and Advertising Specialties
Sales Range $5
M
to 10
M
# of Employees 165
Plant Area
n/a
Annual Production 3,000,000
pieces
Production Hrs. Annual 2,400
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,283 1,262,896
kWh
Natural Gas $12,340 1,985
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,201 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,369

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,863 $953 $1,863
18,464
kWh
- -
02 2.4322: Use or replace with energy efficient substitutes $174 $200 $174
1,758
kWh
- -
03 2.7447: Install vinyl strip / high speed / air curtain doors $302 $46 - $302
-
MMBtu
-
04 3.6121: Burn waste paper for heat $10,055 $25,200 - $8,279
-
MMBtu
$1,776
05 2.6212: Turn off equipment during breaks, reduce operating time $13,133 $1,900 $13,133
130,422
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,200 $104 $3,200
31,653
kWh
- -
07 2.2511: Insulate bare equipment $1,765 $1,800 $2,069
20,516
kWh
$(-304.0)
-
MMBtu
-
08 2.3191: Use demand controller or load shedder $20,755 $1,900 $20,755
-
kWh
- -
09 2.6121: Reduce hot water temperature to the minimum required $605 - $605
5,862
kWh
- -
10 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,307 $1,400 $1,774
17,585
kWh
$(-467.0)
-
MMBtu
-
11 2.1233: Analyze flue gas for proper air/fuel ratio $439 $497 - $439
-
MMBtu
-
12 2.1123: Install automatic stack damper $603 $1,000 - $603
-
MMBtu
-
TOTAL RECOMMENDED $54,201 $35,000 $43,573
226,260
kWh
$8,852
-
MMBtu
$1,776
TOTAL IMPLEMENTED $43,369 $8,600 $43,399
224,502
kWh
$(-30.0)
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs