ITAC Assessment: MA0550
ITAC logo
ITAC Assessment: MA0550
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Flexible poyurethane foam
NAICS 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 49
Plant Area 129,500
ft2
Annual Production 60,000
thousand feet
Production Hrs. Annual 2,860
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,542 1,152,224
kWh
Electricity Demand $32,017 5,048
kW-mo/yr
Electricity Fees $807 -
Natural Gas $73,340 7,289
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $114,888 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Personnel Changes Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $86,929 $32,965 - $50,983
-
MMBtu
$35,946
-
MMBtu
-
02 2.2437: Recover waste heat from equipment $15,960 $23,000 $(-2,231.0)
(-26,100)
kWh
$18,191
-
MMBtu
- -
03 2.3212: Optimize plant power factor $10,668 $2,066 $668
8,100
kWh
- - $10,000
04 2.2625: Chill water to the highest temperature possible $599 - $599
7,000
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $547 - $547
6,400
kWh
- - -
06 2.2511: Insulate bare equipment $185 $120 $185
2,300
kWh
- - -
TOTAL RECOMMENDED $114,888 $58,151 $(-232.0)
(-2,300)
kWh
$69,174
-
MMBtu
$35,946
-
MMBtu
$10,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs