ITAC Assessment: SD0595
ITAC logo
ITAC Assessment: SD0595
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Drums
NAICS 332439: Other Metal Container Manufacturing
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 38,000
ft2
Annual Production 300,000
units
Production Hrs. Annual 2,678
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,274 517,632
kWh
Electricity Demand $56,617 3,797
kW-mo/yr
Electricity Fees $2,381 -
Natural Gas $68,359 9,309
MMBtu
TOTAL YEARLY COSTS $174,631
RECOMMENDED SAVINGS* $10,414 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,406

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,029 $300 $1,486
16,294
kWh
$543
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $629 - $629
6,889
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $679 $1,983 $380
4,159
kWh
$277
-
kW-mo/yr
- $22
04 2.2414: Use waste heat from hot flue gases to preheat $5,799 $8,000 - - $5,799
-
MMBtu
-
05 2.2135: Repair and eliminate steam leaks $727 $600 - - $727
-
MMBtu
-
06 2.2514: Cover open tanks $551 $818 - - $551
-
MMBtu
-
TOTAL RECOMMENDED $10,414 $11,701 $2,495
27,342
kWh
$820
-
kW-mo/yr
$7,077
-
MMBtu
$22
TOTAL IMPLEMENTED $1,406 $2,583 $380
4,159
kWh
$277
-
kW-mo/yr
$727
-
MMBtu
$22
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs