Assessment Year | 2020 |
---|---|
Principal Product | Drums |
NAICS | 332439: Other Metal Container Manufacturing |
SIC | 3429: Hardware, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 35 |
Plant Area |
38,000
ft2
|
Annual Production | 300,000
units
|
Production Hrs. Annual | 2,678
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $47,274 | 517,632 |
kWh
|
$0.091 |
Electricity Demand | $56,617 | 3,797 |
kW-mo/yr
|
$14.91 |
Electricity Fees | $2,381 | - |
|
- |
Natural Gas | $68,359 | 9,309 |
MMBtu
|
$7.34 |
TOTAL YEARLY COSTS | $174,631 | |||
RECOMMENDED SAVINGS* | $10,414 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,406 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,029 | $300 |
$1,486
16,294
kWh
|
$543
-
kW-mo/yr
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $629 | - |
$629
6,889
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $679 | $1,983 |
$380
4,159
kWh
|
$277
-
kW-mo/yr
|
- | $22 | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $5,799 | $8,000 | - | - |
$5,799
-
MMBtu
|
- | |
05 | 2.2135: Repair and eliminate steam leaks | $727 | $600 | - | - |
$727
-
MMBtu
|
- | |
06 | 2.2514: Cover open tanks | $551 | $818 | - | - |
$551
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $10,414 | $11,701 |
$2,495
27,342
kWh
|
$820
-
kW-mo/yr
|
$7,077
-
MMBtu
|
$22 | ||
TOTAL IMPLEMENTED | $1,406 | $2,583 |
$380
4,159
kWh
|
$277
-
kW-mo/yr
|
$727
-
MMBtu
|
$22 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs