Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

106

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Frozen cakes, pies, and other pastries manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0461 #03 Y:2018 Install compressor air intakes in coolest locations $910 $651
SU0461 #02 Y:2018 Reschedule plant operations or reduce load to avoid peaks $3,138 $700
SU0461 #01 Y:2018 Reduce the pressure of compressed air to the minimum required $2,315 -
BS0068 #05 Y:2015 Increase amount of waste recovered for resale $12,480 $11,240
BS0068 #04 Y:2015 Use optimum thickness insulation $29 $100
BS0068 #03 Y:2015 Air condition only space necessary $1,060 $4,455
BS0068 #02 Y:2015 Use flue gases to heat process or service water $1,272 $5,853
BS0068 #01 Y:2015 Use optimum thickness insulation $70 $51
MZ0156 #08 Y:2014 Install vinyl strip / high speed / air curtain doors $11,299 $10,282
MZ0156 #07 Y:2014 Use most efficient type of electric motors $31,514 $141,366
MZ0156 #06 Y:2014 Repair faulty insulation in furnaces, boilers, etc $1,337 $676
MZ0156 #05 Y:2014 Use optimum thickness insulation $9,068 $30,128
MZ0156 #04 Y:2014 Recover waste heat from equipment $2,886 $4,400
MZ0156 #03 Y:2014 Maintain air filters by cleaning or replacement $1,460 $400
MZ0156 #02 Y:2014 Install compressor air intakes in coolest locations $3,480 $2,000
MZ0156 #01 Y:2014 Utilize higher efficiency lamps and/or ballasts $23,514 $71,320
OK0866 #14 Y:2013 Reduce heat gain by window tinting $1,077 $16,000
OK0866 #13 Y:2013 Insulate glazing, walls, ceilings, and roofs $189 $2,098
OK0866 #12 Y:2013 Establish burner maintenance schedule for boilers $2,408 $2,686
OK0866 #11 Y:2013 Insulate bare equipment $232 $280