ITAC Assessment: MZ0156
ITAC logo
ITAC Assessment: MZ0156
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Bakery Products
NAICS 311813: Frozen Cakes, Pies, and Other Pastries Manufacturing
SIC 2045: Prepared Flour Mixes and Doughs
Sales Range $5
M
to 10
M
# of Employees 235
Plant Area 109,000
ft2
Annual Production 3,300,600
lb
Production Hrs. Annual 8,112
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $791,065 14,006,894
kWh
Electricity Demand $72,985 26,735
kW-mo/yr
Natural Gas $136,148 54,614
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,558 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,221

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $23,514 $71,320 $21,932
391,638
kWh
$1,582
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $3,480 $2,000 $3,480
62,135
kWh
- -
03 2.6127: Maintain air filters by cleaning or replacement $1,460 $400 $1,460
26,066
kWh
- -
04 2.2437: Recover waste heat from equipment $2,886 $4,400 - - $2,886
-
MMBtu
05 2.2515: Use optimum thickness insulation $9,068 $30,128 $9,068
161,929
kWh
- -
06 2.1131: Repair faulty insulation in furnaces, boilers, etc $1,337 $676 $1,337
23,880
kWh
- -
07 2.4133: Use most efficient type of electric motors $31,514 $141,366 $29,541
527,526
kWh
$1,973
-
kW-mo/yr
-
08 2.7447: Install vinyl strip / high speed / air curtain doors $11,299 $10,282 $11,299
201,766
kWh
- -
TOTAL RECOMMENDED $84,558 $260,572 $78,117
1,394,940
kWh
$3,555
-
kW-mo/yr
$2,886
-
MMBtu
TOTAL IMPLEMENTED $83,221 $259,896 $76,780
1,371,060
kWh
$3,555
-
kW-mo/yr
$2,886
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs