1,079
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Commercial bakeries | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OK0787 #03 Y:2009 | 03 | 2009 | Utilize higher efficiency lamps and/or ballasts | $5,663 | $20,689 | |
| OK0787 #02 Y:2009 | 02 | 2009 | Utilize higher efficiency lamps and/or ballasts | $1,288 | $7,168 | |
| OK0787 #01 Y:2009 | 01 | 2009 | Use waste heat from hot flue gases to preheat | $11,335 | $47,872 | |
| MI0183 #08 Y:2009 | 08 | 2009 | Install vinyl strip / high speed / air curtain doors | $133 | $60 | |
| MI0183 #07 Y:2009 | 07 | 2009 | Repair faulty insulation in furnaces, boilers, etc | $198 | $180 | |
| MI0183 #06 Y:2009 | 06 | 2009 | Analyze flue gas for proper air/fuel ratio | $1,750 | $1,500 | |
| MI0183 #05 Y:2009 | 05 | 2009 | Install vinyl strip / high speed / air curtain doors | $1,481 | $320 | |
| MI0183 #04 Y:2009 | 04 | 2009 | Utilize higher efficiency lamps and/or ballasts | $2,501 | $2,320 | |
| MI0183 #03 Y:2009 | 03 | 2009 | Install / repair insulation on steam lines | $4,012 | $1,200 | |
| MI0183 #02 Y:2009 | 02 | 2009 | Use heat from boiler blowdown to preheat boiler feed water | $5,816 | $1,280 | |
| MI0183 #01 Y:2009 | 01 | 2009 | Install vinyl strip / high speed / air curtain doors | $11,088 | $1,360 | |
| MA0654 #04 Y:2009 | 04 | 2009 | Use waste heat from hot flue gases to preheat | $9,876 | $9,840 | |
| MA0654 #03 Y:2009 | 03 | 2009 | Install compressor air intakes in coolest locations | $10,377 | $18,330 | |
| MA0654 #02 Y:2009 | 02 | 2009 | Replace existing chiller with high efficiency model | $15,750 | $30,000 | |
| MA0654 #01 Y:2009 | 01 | 2009 | Use hot process fluids to preheat incoming process fluids | $22,566 | $39,500 | |
| OR0546 #09 Y:2009 | 09 | 2009 | Install / repair insulation on steam lines | $3,251 | $1,456 | |
| OR0546 #08 Y:2009 | 08 | 2009 | Eliminate or reduce compressed air usage | $2,132 | $13,620 | |
| OR0546 #07 Y:2009 | 07 | 2009 | Use adjustable frequency drive or multiple speed motors on existing system | $1,406 | $1,600 | |
| OR0546 #06 Y:2009 | 06 | 2009 | Use most efficient type of electric motors | $14,466 | $37,682 | |
| OR0546 #05 Y:2009 | 05 | 2009 | Eliminate practice of mixing waste streams | $3,220 | $6,680 |