ITAC Assessment: OR0546
ITAC logo
ITAC Assessment: OR0546
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Bread and Buns
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 124,500
ft2
Annual Production 52,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $232,725 6,853,200
kWh
Electricity Demand $70,691 11,852
kW-mo/yr
Natural Gas $584,556 56,126
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,952 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $7,000 $350 - - $7,000
-
MMBtu
- -
02 2.1113: Reduce combustion air flow to optimum $24,190 $17,000 - - $24,190
-
MMBtu
- -
03 2.3212: Optimize plant power factor $7,200 $10,500 - $7,200
-
kW-mo/yr
- - -
04 2.7135: Install occupancy sensors $4,087 $7,170 $2,461
74,868
kWh
- - - $1,626
05 3.1291: Eliminate practice of mixing waste streams $3,220 $6,680 - - - $3,220
-
lb
-
06 2.4133: Use most efficient type of electric motors $14,466 $37,682 $11,501
349,478
kWh
$2,965
-
kW-mo/yr
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,406 $1,600 $1,116
33,908
kWh
$290
-
kW-mo/yr
- - -
08 2.4239: Eliminate or reduce compressed air usage $2,132 $13,620 $2,132
89,577
kWh
- - - -
09 2.2136: Install / repair insulation on steam lines $3,251 $1,456 - - $3,251
-
MMBtu
- -
TOTAL RECOMMENDED $66,952 $96,058 $17,210
547,831
kWh
$10,455
-
kW-mo/yr
$34,441
-
MMBtu
$3,220
-
lb
$1,626
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs