ITAC Assessment: MA0654
ITAC logo
ITAC Assessment: MA0654
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Baked bread products
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 207
Plant Area 74,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $619,817 4,372,200
kWh
Electricity Demand $39,151 9,064
kW-mo/yr
Electricity Fees $876 -
Natural Gas $527,976 44,735
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,569 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,127

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $22,566 $39,500 $(-145.0)
(-1,099)
kWh
- $22,711
-
MMBtu
02 2.2622: Replace existing chiller with high efficiency model $15,750 $30,000 $14,950
113,257
kWh
$800
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $10,377 $18,330 $10,377
78,619
kWh
- -
04 2.2414: Use waste heat from hot flue gases to preheat $9,876 $9,840 - - $9,876
-
MMBtu
TOTAL RECOMMENDED $58,569 $97,670 $25,182
190,777
kWh
$800
-
kW-mo/yr
$32,587
-
MMBtu
TOTAL IMPLEMENTED $26,127 $48,330 $25,327
191,876
kWh
$800
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs