| Assessment Year | 1998 |
|---|---|
| Principal Product | Gears |
| NAICS |
n/a
|
| SIC | 3495: Wire Springs |
| Sales Range | $10 M to 50M |
| # of Employees | 147 |
| Plant Area |
74,000
ft2
|
| Annual Production | 15,750,000
pieces
|
| Production Hrs. Annual | 6,300
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $93,229 | 1,522,861 |
kWh
|
$0.061 |
| Electricity Demand | $51,477 | 4,092 |
kW-mo/yr
|
$12.58 |
| Electricity Fees | $(-310.0) | - |
|
- |
| Natural Gas | $20,906 | 3,719 |
MMBtu
|
$5.62 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,853 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,084 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,215 | $300 |
$1,549
26,964
kWh
|
$666
-
kW-mo/yr
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $289 | $844 |
$138
2,345
kWh
|
$151
-
kW-mo/yr
|
- | - | |
| 03 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $894 | $3,212 | - | - |
$894
-
MMBtu
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,181 | $1,300 | - | - |
$2,181
-
MMBtu
|
- | |
| 05 | 2.2437: Recover waste heat from equipment | $694 | $4,000 | - | - |
$694
-
MMBtu
|
- | |
| 06 | 3.5316: Contract a wood pallet recycling company | $580 | - | - | - | - |
$580
-
lb
|
|
| TOTAL RECOMMENDED | $6,853 | $9,656 |
$1,687
29,309
kWh
|
$817
-
kW-mo/yr
|
$3,769
-
MMBtu
|
$580
-
lb
|
||
| TOTAL IMPLEMENTED | $3,084 | $1,144 |
$1,687
29,309
kWh
|
$817
-
kW-mo/yr
|
- |
$580
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs