| Assessment Year | 2014 |
|---|---|
| Principal Product | Geosynthetic lining products |
| NAICS | 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing |
| SIC | 3081: Unsupported Plastics Film and Sheet |
| Sales Range | $50 M to 100M |
| # of Employees | 200 |
| Plant Area |
149,415
ft2
|
| Annual Production | 132,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $2,116,984 | 41,074,332 |
kWh
|
$0.052 |
| Electricity Demand | $578,217 | 64,481 |
kW-mo/yr
|
$8.97 |
| Electricity Fees | $12,214 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $122,760 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $23,985 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $91,770 | $1,500 |
$74,520
1,433,000
kWh
|
$17,250
-
kW-mo/yr
|
|
| 02 | 2.3212: Optimize plant power factor | $14,900 | $37,100 | - |
$14,900
-
kW-mo/yr
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,965 | $5,090 |
$4,850
93,210
kWh
|
$1,115
-
kW-mo/yr
|
|
| 04 | 2.4133: Use most efficient type of electric motors | $5,680 | $30,600 |
$4,610
88,700
kWh
|
$1,070
-
kW-mo/yr
|
|
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,195 | $500 |
$1,785
34,300
kWh
|
$410
-
kW-mo/yr
|
|
| 06 | 2.7145: Install skylights | $1,040 | $3,790 |
$1,040
20,070
kWh
|
- | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $740 | $20 |
$620
11,890
kWh
|
$120
-
kW-mo/yr
|
|
| 08 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $320 | - |
$320
6,200
kWh
|
- | |
| 09 | 2.7134: Use photocell controls | $150 | - |
$150
2,800
kWh
|
- | |
| TOTAL RECOMMENDED | $122,760 | $78,600 |
$87,895
1,690,170
kWh
|
$34,865
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $23,985 | $68,220 |
$7,485
143,890
kWh
|
$16,500
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs