ITAC Assessment: LL0328
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Tube Alloy
NAICS 332811: Metal Heat Treating
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 15,000
ft2
Annual Production 4,000,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $277,361 3,603,365
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,652 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,724

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.4222: Install adequate dryers on air lines to eliminate blowdown $26,498 $304 $26,498
344,263
kWh
-
02 2.7224: Reduce space conditioning during non-working hours $9,654 $3,600 $9,654
125,424
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,572 $2,800 $6,572
85,389
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,119 $700 $512
6,658
kWh
$607
05 2.7142: Utilize higher efficiency lamps and/or ballasts $406 $1,435 $406
5,271
kWh
-
06 2.6211: Conserve energy by efficient use of vending machines $403 $471 $403
5,242
kWh
-
TOTAL RECOMMENDED $44,652 $9,310 $44,045
572,247
kWh
$607
TOTAL IMPLEMENTED $42,724 $6,704 $42,724
555,076
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs