ITAC Assessment: SD0170
ITAC logo
ITAC Assessment: SD0170
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Plastic bags, shipping sacks, shipping envelopes and polyeth
NAICS
n/a
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 37,000
ft2
Annual Production 14,000,000
lb
Production Hrs. Annual 8,640
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $341,244 6,851,114
kWh
Electricity Demand $192,003 11,563
kW-mo/yr
Natural Gas $7,412 1,184
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $172,586 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $120,732

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $23,299 $26,840 $15,946
318,875
kWh
$7,353
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,867 $400 $1,962
39,273
kWh
$905
-
kW-mo/yr
- - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $51,854 $28,000 $39,600
792,204
kWh
$16,434
-
kW-mo/yr
$(-4,180.0)
-
MMBtu
- -
04 3.3128: Utilize other methods to remove contaminants $3,600 $7,000 - - - - $3,600
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,009 $19,050 $16,436
241,794
kWh
$5,573
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,642 $1,989 $3,162
63,306
kWh
$1,480
-
kW-mo/yr
- - -
07 2.7144: Install spectral reflectors / delamp $618 $960 $317
6,448
kWh
$301
-
kW-mo/yr
- - -
08 2.7135: Install occupancy sensors $1,790 $369 $1,115
22,274
kWh
$675
-
kW-mo/yr
- - -
09 3.5311: Recover and reuse waste material $15,300 $5,500 - - - - $15,300
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,900 $9,000 - - - - $5,900
11 3.7134: Wash and reuse rags on-site $2,920 $500 - - - $2,920
-
lb
-
12 4.821: Pay bills on time to avoid late fees $3,467 - - - - - $3,467
13 4.441: Install automatic packing equipment $34,320 $350 - - - - $34,320
TOTAL RECOMMENDED $172,586 $99,958 $78,538
1,484,174
kWh
$32,721
-
kW-mo/yr
$(-4,180.0)
-
MMBtu
$2,920
-
lb
$62,587
TOTAL IMPLEMENTED $120,732 $71,958 $38,938
691,970
kWh
$16,287
-
kW-mo/yr
- $2,920
-
lb
$62,587
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs