Assessment Year | 2009 |
---|---|
Principal Product | Baked Goods |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $1 M to 5M |
# of Employees | 27 |
Plant Area |
27,000
ft2
|
Annual Production | 1,750,000
lb
|
Production Hrs. Annual | 2,754
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $45,593 | 617,760 |
kWh
|
$0.074 |
Electricity Demand | $11,689 | 1,536 |
kW-mo/yr
|
$7.61 |
Electricity Fees | $8,439 | - |
|
- |
Natural Gas | $77,662 | 5,393 |
MMBtu
|
$14.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,979 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,452 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $11,088 | $1,360 | - | - |
$11,088
-
MMBtu
|
- | |
02 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $5,816 | $1,280 |
$3,997
54,757
kWh
|
$1,819
-
kW-mo/yr
|
- | - | |
03 | 2.2136: Install / repair insulation on steam lines | $4,012 | $1,200 | - | - |
$4,012
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,501 | $2,320 |
$1,720
23,561
kWh
|
$781
-
kW-mo/yr
|
- | - | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,481 | $320 |
$1,018
13,949
kWh
|
$463
-
kW-mo/yr
|
- | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,750 | $1,500 | - | - | - |
$1,750
-
MMBtu
|
|
07 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $198 | $180 |
$136
1,862
kWh
|
$62
-
kW-mo/yr
|
- | - | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $133 | $60 | - | - | - |
$133
-
MMBtu
|
|
TOTAL RECOMMENDED | $26,979 | $8,220 |
$6,871
94,129
kWh
|
$3,125
-
kW-mo/yr
|
$15,100
-
MMBtu
|
$1,883
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,452 | $3,240 |
$1,018
13,949
kWh
|
$463
-
kW-mo/yr
|
$11,088
-
MMBtu
|
$1,883
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs