ITAC Assessment: OK0787
ITAC logo
ITAC Assessment: OK0787
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Par-Baked Biscuits
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 175
Plant Area 137,000
ft2
Annual Production 3,250,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $673,173 12,747,000
kWh
Natural Gas $386,835 53,879
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,968 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,915

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $11,335 $47,872 - $11,335
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,288 $7,168 $1,288
24,391
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,663 $20,689 $5,663
107,247
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $8,813 $22,000 - $8,813
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $176 $86 - $176
-
MMBtu
06 2.1224: Replace boiler $13,921 $51,278 - $13,921
-
MMBtu
07 2.7232: Replace existing hvac unit with high efficiency model $8,451 $16,000 $8,451
160,058
kWh
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,321 $9,900 $17,321
328,054
kWh
-
TOTAL RECOMMENDED $66,968 $174,993 $32,723
619,750
kWh
$34,245
-
MMBtu
TOTAL IMPLEMENTED $9,915 $23,254 $9,739
184,449
kWh
$176
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs