Assessment Year | 2010 |
---|---|
Principal Product | Par-Baked Biscuits |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $50 M to 100M |
# of Employees | 175 |
Plant Area |
137,000
ft2
|
Annual Production | 3,250,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $673,173 | 12,747,000 |
kWh
|
$0.053 |
Natural Gas | $386,835 | 53,879 |
MMBtu
|
$7.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $66,968 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,915 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $11,335 | $47,872 | - |
$11,335
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,288 | $7,168 |
$1,288
24,391
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,663 | $20,689 |
$5,663
107,247
kWh
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,813 | $22,000 | - |
$8,813
-
MMBtu
|
|
05 | 2.2136: Install / repair insulation on steam lines | $176 | $86 | - |
$176
-
MMBtu
|
|
06 | 2.1224: Replace boiler | $13,921 | $51,278 | - |
$13,921
-
MMBtu
|
|
07 | 2.7232: Replace existing hvac unit with high efficiency model | $8,451 | $16,000 |
$8,451
160,058
kWh
|
- | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,321 | $9,900 |
$17,321
328,054
kWh
|
- | |
TOTAL RECOMMENDED | $66,968 | $174,993 |
$32,723
619,750
kWh
|
$34,245
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,915 | $23,254 |
$9,739
184,449
kWh
|
$176
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs