ITAC Assessment: AM0300
ITAC logo
ITAC Assessment: AM0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Industrial metal-seated ball valves
NAICS
n/a
SIC 3491: Industrial Valves
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 36,000
ft2
Annual Production 840
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,563 1,280,774
kWh
Electricity Demand $13,826 4,580
kW-mo/yr
Electricity Fees $230 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,020 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,310

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.3212: Optimize plant power factor $11,000 $12,000 - $11,000
-
kW-mo/yr
- -
02 3.1163: Use plastic pallets instead of wood $2,320 - - - - $2,320
03 3.7131: Use a rag recycle service $780 $60 - - - $780
04 2.7142: Utilize higher efficiency lamps and/or ballasts $530 $220 $270
6,741
kWh
$260
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $240 $160 $40
879
kWh
$10
-
kW-mo/yr
- $190
06 3.5316: Contract a wood pallet recycling company $150 - - - $150
-
lb
-
TOTAL RECOMMENDED $15,020 $12,440 $310
7,620
kWh
$11,270
-
kW-mo/yr
$150
-
lb
$3,290
TOTAL IMPLEMENTED $1,310 $280 $270
6,741
kWh
$260
-
kW-mo/yr
- $780
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs