Assessment Year | 1991 |
---|---|
Principal Product | KITCHEN CABINETS |
NAICS |
n/a
|
SIC | 2434: Wood Kitchen Cabinets |
Sales Range | $5 M to 10M |
# of Employees | 65 |
Plant Area |
n/a
|
Annual Production | 125,000
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $112,334 | 1,410,023 |
kWh
|
$0.080 |
Natural Gas | $15,306 | 2,374 |
MMBtu
|
$6.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,463 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,463 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,745 | $400 |
$10,745
134,818
kWh
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,139 | - |
$1,139
14,361
kWh
|
- | |
03 | 2.4312: Improve lubrication practices | $467 | $2,000 |
$467
5,862
kWh
|
- | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,260 | $200 |
$1,260
15,826
kWh
|
- | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $1,706 | - |
$1,706
21,395
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $271 | $96 |
$271
3,517
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $151 | $413 |
$151
2,052
kWh
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $263 | - |
$263
3,224
kWh
|
- | |
09 | 2.2511: Insulate bare equipment | $461 | $366 | - |
$461
-
MMBtu
|
|
TOTAL RECOMMENDED | $16,463 | $3,475 |
$16,002
201,055
kWh
|
$461
-
MMBtu
|
||
TOTAL IMPLEMENTED | $16,463 | $3,475 |
$16,002
201,055
kWh
|
$461
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs