Assessment Year | 2012 |
---|---|
Principal Product | Pharmaceutical Preparation Manufacturing |
NAICS | 339113: Surgical Appliance and Supplies Manufacturing |
SIC | 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies |
Sales Range | $10 M to 50M |
# of Employees | 400 |
Plant Area |
80,000
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 4,992
hrs
|
Location (State) | Puerto Rico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,406,079 | 5,418,475 |
kWh
|
$0.26 |
Electricity Demand | $135,011 | 13,335 |
kW-mo/yr
|
$10.12 |
Electricity Fees | $5,541 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $497,595 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $430,308 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7425: Clean or color roof to reduce solar load | $246,388 | $33,021 |
$225,227
869,604
kWh
|
$21,161
-
kW-mo/yr
|
|
02 | 2.7221: Lower temperature during the winter season and vice-versa | $150,126 | $80 |
$143,393
553,639
kWh
|
$6,733
-
kW-mo/yr
|
|
03 | 2.7496: Install partitions to reduce size of conditioned space | $44,157 | $11,632 |
$40,360
155,829
kWh
|
$3,797
-
kW-mo/yr
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,400 | $1,660 |
$11,803
45,572
kWh
|
$597
-
kW-mo/yr
|
|
05 | 2.3212: Optimize plant power factor | $10,216 | $11,120 | - |
$10,216
-
kW-mo/yr
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,406 | $1,060 |
$6,771
26,140
kWh
|
$635
-
kW-mo/yr
|
|
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,508 | $5,069 |
$5,032
19,428
kWh
|
$476
-
kW-mo/yr
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,430 | $2,665 |
$4,964
19,163
kWh
|
$466
-
kW-mo/yr
|
|
09 | 2.7135: Install occupancy sensors | $5,193 | $800 |
$4,747
18,330
kWh
|
$446
-
kW-mo/yr
|
|
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,631 | $2,050 |
$4,226
16,473
kWh
|
$405
-
kW-mo/yr
|
|
11 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,084 | $80 |
$2,719
10,499
kWh
|
$365
-
kW-mo/yr
|
|
12 | 2.6127: Maintain air filters by cleaning or replacement | $3,056 | $843 |
$2,793
10,783
kWh
|
$263
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $497,595 | $70,080 |
$452,035
1,745,460
kWh
|
$45,560
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $430,308 | $41,199 |
$399,872
1,544,063
kWh
|
$30,436
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs