Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,234

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Bread and bakery product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0612 #02 Y:2023 Keep doors and windows shut when not on use $175 $59
SF0612 #01 Y:2023 Install vinyl strip / high speed / air curtain doors $2,332 $226
CM1019 #04 Y:2023 Install sensors to detect and avoid jams $7,058 $30,570
CM1019 #03 Y:2023 Increase efficiency of trucks $43,375 $394,000
CM1019 #02 Y:2023 Utilize controls to operate equipment only when needed $93,012 $807,500
CM1019 #01 Y:2023 Use solar heat to make electricty $44,370 $657,982
IP0172 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $7,584 $8,088
IP0172 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $14,315 $14,588
IP0172 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $5,870 $1,313
IP0172 #02 Y:2023 Install or upgrade insulation on hvac distribution systems $512 $83
IP0172 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $8,640 $132
NT0003 #06 Y:2023 Replace existing hvac unit with high efficiency model $23,020 $185,220
NT0003 #05 Y:2023 Replace air curtain doors with solid doors $2,238 $3,193
NT0003 #04 Y:2023 Install occupancy sensors $3,289 $1,600
NT0003 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $10,623 $24,707
NT0003 #02 Y:2023 Optimize plant power factor $12,262 $21,725
NT0003 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $3,267 $5,705
GT0965 #05 Y:2023 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $103,640 $350,000
GT0965 #04 Y:2023 Utilize higher efficiency lamps and/or ballasts $281 $927
GT0965 #03 Y:2023 Reduce the pressure of compressed air to the minimum required $13,164 $800