ITAC Assessment: GT0965
ITAC logo
ITAC Assessment: GT0965
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Bagels, Rolls, Hamburger and Hotdog Buns
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 350,000
ft2
Annual Production 78,060,959
lb
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $933,138 11,142,400
kWh
Natural Gas $654,872 94,137
MMBtu
TOTAL YEARLY COSTS $1,588,010
RECOMMENDED SAVINGS* $174,462 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,459

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $23,363 $800 - $23,363 - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $34,014 $1,850 $36,914
439,452
kWh
- - $(-2,900.0)
03 2.4231: Reduce the pressure of compressed air to the minimum required $13,164 $800 $13,164
156,717
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $281 $927 $281
3,342
kWh
- - -
05 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $103,640 $350,000 $147,168
1,752,000
kWh
- $(-43,527.8)
-
MMBtu
-
TOTAL RECOMMENDED $174,462 $354,377 $197,527
2,351,511
kWh
$23,363 $(-43,527.8)
-
MMBtu
$(-2,900.0)
TOTAL IMPLEMENTED $47,459 $3,577 $50,359
599,511
kWh
- - $(-2,900.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs