ITAC Assessment: IP0172
ITAC logo
ITAC Assessment: IP0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Baked Goods
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 360
Plant Area 205,000
ft2
Annual Production 126,086,485
lb
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $184,524 3,778,541
kWh
Electricity Demand $141,448 7,044
kW-mo/yr
Electricity Fees $1,699 -
Natural Gas $57,950 8,318
MMBtu
Waste Disposal Costs
Water Usage $77,069 29,153
Tgal
TOTAL YEARLY COSTS $462,690
RECOMMENDED SAVINGS* $36,921 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,640 $132 $8,640
176,339
kWh
-
02 2.7212: Install or upgrade insulation on hvac distribution systems $512 $83 $489
9,986
kWh
$23
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,870 $1,313 $2,416
49,297
kWh
$3,454
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,315 $14,588 $14,315
292,143
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,584 $8,088 $7,584
154,776
kWh
-
TOTAL RECOMMENDED $36,921 $24,204 $33,444
682,541
kWh
$3,477
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs