matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Seafood product preparation and packaging | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UW2415 #12 Y:2024 | 12 | 2024 | Use or replace with energy efficient substitutes | $62,298 | $19,622 |
n/a
|
UW2415 #11 Y:2024 | 11 | 2024 | Initiate a program to acquire iso certification | $64,033 | $47,500 |
n/a
|
UW2415 #10 Y:2024 | 10 | 2024 | Utilize a less expensive cooling method | $32,733 | $55,000 |
n/a
|
UW2415 #09 Y:2024 | 09 | 2024 | Use solar heat to make electricty | $29,064 | $195,867 |
n/a
|
UW2415 #08 Y:2024 | 08 | 2024 | Use / purchase optimum sized compressor | $4,441 | $20,000 |
n/a
|
UW2415 #07 Y:2024 | 07 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $16,888 | $25,000 |
n/a
|
UW2415 #06 Y:2024 | 06 | 2024 | Modify facility to avoid excess maintenance costs | $100,020 | $225,274 |
n/a
|
UW2415 #05 Y:2024 | 05 | 2024 | Install refrigeration system to cool product | $1,080,000 | $870,000 |
n/a
|
UW2415 #04 Y:2024 | 04 | 2024 | Eliminate old stock and modify inventory control | $1,150,001 | $380,750 |
n/a
|
UW2415 #03 Y:2024 | 03 | 2024 | Utilize higher efficiency lamps and/or ballasts | $60,318 | $7,015 |
n/a
|
UW2415 #02 Y:2024 | 02 | 2024 | Isolate hot or cold equipment | $7,755 | $3,047 |
n/a
|
UW2415 #01 Y:2024 | 01 | 2024 | Install occupancy sensors | $1,616 | $2,203 |
n/a
|
SJ0027 #04 Y:2024 | 04 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $3,837 | $1,550 |
n/a
|
SJ0027 #03 Y:2024 | 03 | 2024 | Turn off equipment when not in use | $3,400 | - |
n/a
|
SJ0027 #02 Y:2024 | 02 | 2024 | Install vinyl strip / high speed / air curtain doors | $32,211 | $22,296 |
n/a
|
SJ0027 #01 Y:2024 | 01 | 2024 | Use solar heat to make electricty | $89,704 | $333,155 |
n/a
|
SF0626 #09 Y:2024 | 09 | 2024 | Use solar heat to make electricty | $81,243 | $249,045 |
n/a
|
SF0626 #08 Y:2024 | 08 | 2024 | Insulate bare equipment | $166 | $750 |
n/a
|
SF0626 #07 Y:2024 | 07 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $19,248 | $52,290 |
n/a
|
SF0626 #06 Y:2024 | 06 | 2024 | Utilize higher efficiency lamps and/or ballasts | $8,227 | $12,256 |
n/a
|