ITAC Assessment: UW2415
ITAC logo
ITAC Assessment: UW2415
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Fresh and Frozen Seafood
NAICS 311710: Seafood Product Preparation and Packaging
SIC 2091: Canned and Cured Fish and Seafoods
Sales Range $50
M
to 100
M
# of Employees 117
Plant Area 50,000
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 6,552
hrs
Location (State) Alaska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,280 2,096,000
kWh
Electricity Demand $338,085 7,227
kW-mo/yr
Electricity Fees $(-31,898.0) -
Natural Gas $29,123 2,514
MMBtu
LPG $44,444 1,036
MMBtu
Fuel Oil #1 $16,855 620
MMBtu
Waste Disposal Costs
Water Usage $94,364 13,996
Tgal
Water Disposal $139,810 13,996
Tgal
Solid Waste (non-haz) $98,937 895,075
lb
TOTAL YEARLY COSTS $851,000
RECOMMENDED SAVINGS* $2,609,167 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Water Usage Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings Primary Product Savings Increase in Production Savings
01 2.7135: Install occupancy sensors $1,616 $2,203 $1,616
27,905
kWh
- - - - - - - -
02 2.2522: Isolate hot or cold equipment $7,755 $3,047 $7,755
133,933
kWh
- - - - - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $60,318 $7,015 $21,769
375,969
kWh
$38,549
-
kW-mo/yr
- - - - - - -
04 4.322: Eliminate old stock and modify inventory control $1,150,001 $380,750 - - - - - - - $1,150,000 $1
05 4.113: Install refrigeration system to cool product $1,080,000 $870,000 - - - - - - - - $1,080,000
06 4.463: Modify facility to avoid excess maintenance costs $100,020 $225,274 - - - - $20
-
Tgal
- - $100,000 -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,888 $25,000 $5,947
102,782
kWh
$10,941
-
kW-mo/yr
- - - - - - -
08 2.4226: Use / purchase optimum sized compressor $4,441 $20,000 $2,102
36,305
kWh
$2,339
-
kW-mo/yr
- - - - - - -
09 2.9114: Use solar heat to make electricty $29,064 $195,867 $29,064
502,279
kWh
- - - - - - - -
10 2.2628: Utilize a less expensive cooling method $32,733 $55,000 - - - - $246
-
Tgal
$365
-
Tgal
$4,522 - $27,600
11 4.721: Initiate a program to acquire iso certification $64,033 $47,500 $14,563
251,520
kWh
$40,571
-
kW-mo/yr
$3,566
-
MMBtu
$5,333
-
MMBtu
- - - - -
12 2.4322: Use or replace with energy efficient substitutes $62,298 $19,622 $4,109
71,024
kWh
$(-22,239.0)
-
kW-mo/yr
- - - - $80,428 - -
TOTAL RECOMMENDED $2,609,167 $1,851,278 $86,925
1,501,717
kWh
$70,161
-
kW-mo/yr
$3,566
-
MMBtu
$5,333
-
MMBtu
$266
-
Tgal
$365
-
Tgal
$84,950 $1,250,000 $1,107,601
TOTAL IMPLEMENTED - - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Water Usage Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs