Assessment Year | 2020 |
---|---|
Principal Product | Pharmaceutical Plastics |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | less than $500 k |
# of Employees | 114 |
Plant Area |
77,000
ft2
|
Annual Production | 2,100,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $236,756 | 5,531,900 |
kWh
|
$0.043 |
Electricity Demand | $172,897 | 9,306 |
kW-mo/yr
|
$18.58 |
Electricity Fees | $25,584 | - |
|
- |
TOTAL YEARLY COSTS | $435,237 | |||
RECOMMENDED SAVINGS* | $41,586 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,997 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,923 | $1,064 |
$8,258
192,937
kWh
|
$4,665
-
kW-mo/yr
|
- | |
02 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $12,415 | $1,195 |
$6,827
159,520
kWh
|
$5,588
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,573 | $19,429 |
$6,152
143,746
kWh
|
$3,659
-
kW-mo/yr
|
$762 | |
04 | 2.4224: Upgrade controls on compressors | $2,840 | $1,830 |
$1,815
42,400
kWh
|
$1,025
-
kW-mo/yr
|
- | |
05 | 2.7135: Install occupancy sensors | $2,501 | $4,830 |
$2,501
58,438
kWh
|
- | - | |
06 | 2.2511: Insulate bare equipment | $334 | $130 |
$208
4,849
kWh
|
$126
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $41,586 | $28,478 |
$25,761
601,890
kWh
|
$15,063
-
kW-mo/yr
|
$762 | ||
TOTAL IMPLEMENTED | $25,997 | $25,323 |
$16,911
395,121
kWh
|
$8,324
-
kW-mo/yr
|
$762 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs