ITAC Assessment: TN0663
ITAC logo
ITAC Assessment: TN0663
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Military Parachutes
NAICS
n/a
SIC 2399: Fabricated Textile Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 70,000
ft2
Annual Production 14,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,845 569,754
kWh
Electricity Demand $17,896 3,660
kW-mo/yr
Electricity Fees $2,105 -
Natural Gas $53,157 10,130
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,297 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,562

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7144: Install spectral reflectors / delamp $6,379 $13,600 $5,923
126,026
kWh
- - - - $456
02 2.7145: Install skylights $4,132 $7,350 $4,132
87,925
kWh
- - - - -
03 3.5313: Increase amount of waste recovered for resale $1,603 $800 - - - $103
-
lb
$1,500 -
04 2.6218: Turn off equipment when not in use $1,041 - $496
10,551
kWh
- $545
-
MMBtu
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $992 $750 $640
13,482
kWh
$352
-
kW-mo/yr
- - - -
06 3.5313: Increase amount of waste recovered for resale $1,950 $800 - - - $450
-
lb
$1,500 -
07 4.112: Replace old machine with new automatic multi-station tool $56,000 $161,000 - - - - $56,000 -
08 4.421: Modify current incentive program $7,200 $4,500 - - - - $7,200 -
TOTAL RECOMMENDED $79,297 $188,800 $11,191
237,984
kWh
$352
-
kW-mo/yr
$545
-
MMBtu
$553
-
lb
$66,200 $456
TOTAL IMPLEMENTED $17,562 $19,650 $7,059
150,059
kWh
$352
-
kW-mo/yr
$545
-
MMBtu
$450
-
lb
$8,700 $456
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs