235
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0938 #02 Y:2015 | 02 | 2015 | Analyze flue gas for proper air/fuel ratio | $3,298 | - | |
| UD0938 #01 Y:2015 | 01 | 2015 | Turn off equipment when not in use | $39,463 | - | |
| WV0502 #10 Y:2014 | 10 | 2014 | Utilize higher efficiency lamps and/or ballasts | $321 | $854 | |
| WV0502 #09 Y:2014 | 09 | 2014 | Insulate bare equipment | $812 | $2,934 | |
| WV0502 #08 Y:2014 | 08 | 2014 | Analyze flue gas for proper air/fuel ratio | $1,826 | $500 | |
| WV0502 #07 Y:2014 | 07 | 2014 | Develop a repair/replace policy | $3,350 | $724 | |
| WV0502 #06 Y:2014 | 06 | 2014 | Optimize plant power factor | $3,830 | $16,400 | |
| WV0502 #05 Y:2014 | 05 | 2014 | Modify refrigeration system to operate at a lower pressure | $6,333 | $2,500 | |
| WV0502 #04 Y:2014 | 04 | 2014 | Use adjustable frequency drive or multiple speed motors on existing system | $6,838 | $20,000 | |
| WV0502 #03 Y:2014 | 03 | 2014 | Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $12,681 | $18,000 | |
| WV0502 #02 Y:2014 | 02 | 2014 | Utilize higher efficiency lamps and/or ballasts | $13,334 | $25,930 | |
| WV0502 #01 Y:2014 | 01 | 2014 | Establish a predictive maintenance program | $13,685 | $1,000 | |
| IA0522 #07 Y:2014 | 07 | 2014 | Turn off equipment when not in use | $524 | $405 | |
| IA0522 #06 Y:2014 | 06 | 2014 | Reduce the pressure of compressed air to the minimum required | $1,589 | $35 | |
| IA0522 #05 Y:2014 | 05 | 2014 | Turn off equipment when not in use | $6,365 | $525 | |
| IA0522 #04 Y:2014 | 04 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,013 | $2,648 | |
| IA0522 #03 Y:2014 | 03 | 2014 | Utilize higher efficiency lamps and/or ballasts | $488 | $1,045 | |
| IA0522 #02 Y:2014 | 02 | 2014 | Size electric motors for peak operating efficiency | $7,680 | $7,327 | |
| IA0522 #01 Y:2014 | 01 | 2014 | Utilize higher efficiency lamps and/or ballasts | $43,915 | $89,600 | |
| AM0654 #08 Y:2013 | 08 | 2013 | Install occupancy sensors | $217 | $400 |