Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

235

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Ice cream and frozen dessert manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0938 #02 Y:2015 Analyze flue gas for proper air/fuel ratio $3,298 -
UD0938 #01 Y:2015 Turn off equipment when not in use $39,463 -
WV0502 #10 Y:2014 Utilize higher efficiency lamps and/or ballasts $321 $854
WV0502 #09 Y:2014 Insulate bare equipment $812 $2,934
WV0502 #08 Y:2014 Analyze flue gas for proper air/fuel ratio $1,826 $500
WV0502 #07 Y:2014 Develop a repair/replace policy $3,350 $724
WV0502 #06 Y:2014 Optimize plant power factor $3,830 $16,400
WV0502 #05 Y:2014 Modify refrigeration system to operate at a lower pressure $6,333 $2,500
WV0502 #04 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $6,838 $20,000
WV0502 #03 Y:2014 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $12,681 $18,000
WV0502 #02 Y:2014 Utilize higher efficiency lamps and/or ballasts $13,334 $25,930
WV0502 #01 Y:2014 Establish a predictive maintenance program $13,685 $1,000
IA0522 #07 Y:2014 Turn off equipment when not in use $524 $405
IA0522 #06 Y:2014 Reduce the pressure of compressed air to the minimum required $1,589 $35
IA0522 #05 Y:2014 Turn off equipment when not in use $6,365 $525
IA0522 #04 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $2,013 $2,648
IA0522 #03 Y:2014 Utilize higher efficiency lamps and/or ballasts $488 $1,045
IA0522 #02 Y:2014 Size electric motors for peak operating efficiency $7,680 $7,327
IA0522 #01 Y:2014 Utilize higher efficiency lamps and/or ballasts $43,915 $89,600
AM0654 #08 Y:2013 Install occupancy sensors $217 $400