Assessment Year | 2014 |
---|---|
Principal Product | Ice Cream |
NAICS | 311520: Ice Cream and Frozen Dessert Manufacturing |
SIC | 2024: Ice Cream and Frozen Desserts |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
218,794
ft2
|
Annual Production | 35,633,000
units
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,117,673 | 20,476,800 |
kWh
|
$0.055 |
Electricity Demand | $707,111 | 44,037 |
kW-mo/yr
|
$16.06 |
Natural Gas | $280,958 | 58,453 |
MMBtu
|
$4.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $62,574 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,915 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $43,915 | $89,600 |
$29,024
531,571
kWh
|
$14,891
-
kW-mo/yr
|
- | |
02 | 2.4131: Size electric motors for peak operating efficiency | $7,680 | $7,327 |
$4,572
83,733
kWh
|
$3,108
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $488 | $1,045 |
$488
8,935
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,013 | $2,648 |
$1,327
24,441
kWh
|
$686
-
kW-mo/yr
|
- | |
05 | 2.6218: Turn off equipment when not in use | $6,365 | $525 |
$461
8,449
kWh
|
$237
-
kW-mo/yr
|
$5,667
-
gal
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,589 | $35 |
$1,049
19,219
kWh
|
$540
-
kW-mo/yr
|
- | |
07 | 2.6218: Turn off equipment when not in use | $524 | $405 |
$524
9,601
kWh
|
- | - | |
TOTAL RECOMMENDED | $62,574 | $101,585 |
$37,445
685,949
kWh
|
$19,462
-
kW-mo/yr
|
$5,667
-
gal
|
||
TOTAL IMPLEMENTED | $43,915 | $89,600 |
$29,024
531,571
kWh
|
$14,891
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs