Assessment Year | 2015 |
---|---|
Principal Product | Ice Cream and Beverages |
NAICS | 311520: Ice Cream and Frozen Dessert Manufacturing |
SIC | 2024: Ice Cream and Frozen Desserts |
Sales Range | $100 M to 500M |
# of Employees | 185 |
Plant Area |
145,350
ft2
|
Annual Production | 10,800
Tgal
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $830,458 | 15,277,101 |
kWh
|
$0.054 |
Electricity Demand | $59,042 | 32,364 |
kW-mo/yr
|
$1.82 |
Electricity Fees | $78,400 | - |
|
- |
Natural Gas | $232,989 | 45,057 |
MMBtu
|
$5.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $217,536 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,865 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $39,463 | - | - | - |
$39,463
-
MMBtu
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,298 | - | - | - |
$3,298
-
MMBtu
|
- | - | |
03 | 2.3132: Recharge batteries on during off-peak demand periods | $1,403 | - | - |
$1,403
-
kW-mo/yr
|
- | - | - | |
04 | 2.4224: Upgrade controls on compressors | $107,431 | - |
$99,557
1,984,000
kWh
|
$7,874
-
kW-mo/yr
|
- | - | - | |
05 | 2.2621: Modify refrigeration system to operate at a lower pressure | $29,938 | $3,000 |
$27,889
555,775
kWh
|
$2,049
-
kW-mo/yr
|
- | - | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,415 | - |
$1,300
25,911
kWh
|
$115
-
kW-mo/yr
|
- | - | - | |
07 | 2.4151: Develop a repair/replace policy | $152 | $530 |
$136
2,713
kWh
|
$16
-
kW-mo/yr
|
- | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,596 | $20,100 |
$4,341
86,500
kWh
|
$255
-
kW-mo/yr
|
- | - | - | |
09 | 2.7232: Replace existing hvac unit with high efficiency model | $807 | $3,133 |
$1,054
21,000
kWh
|
$125
-
kW-mo/yr
|
$(-372.0)
-
MMBtu
|
- | - | |
10 | 2.4221: Install compressor air intakes in coolest locations | $1,880 | $15,000 |
$1,774
35,362
kWh
|
$106
-
kW-mo/yr
|
- | - | - | |
11 | 3.4151: Minimize water usage | $27,153 | $9,300 |
$(-410.0)
(-8,169)
kWh
|
$(-23.0)
-
kW-mo/yr
|
- |
$27,320
-
Tgal
|
$266
-
Tgal
|
|
TOTAL RECOMMENDED | $217,536 | $51,063 |
$135,641
2,703,092
kWh
|
$11,920
-
kW-mo/yr
|
$42,389
-
MMBtu
|
$27,320
-
Tgal
|
$266
-
Tgal
|
||
TOTAL IMPLEMENTED | $4,865 | $530 |
$1,436
28,624
kWh
|
$131
-
kW-mo/yr
|
$3,298
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs