Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product soda, soft drinks
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 192,000
ft2
Annual Production 11,000,000
units
Production Hrs. Annual 5,460
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $526,621 7,574,423
kWh
Electricity Demand $192,763 17,071
kW-mo/yr
Natural Gas $103,559 16,623
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $107,724 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7226: Use computer programs to optimize hvac performance $43,145 $25,340 $41,903
625,275
kWh
$1,242
-
kW-mo/yr
-
02 2.7425: Clean or color roof to reduce solar load $3,404 $5,896 $3,325
35,838
kWh
$79
-
kW-mo/yr
-
03 2.6211: Conserve energy by efficient use of vending machines $1,173 $1,818 $1,173
17,000
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,370 $3,778 $8,370
88,102
kWh
- -
05 2.6231: Utilize controls to operate equipment only when needed $28,580 $12,180 $28,580
300,846
kWh
- -
06 2.1131: Repair faulty insulation in furnaces, boilers, etc $136 $244 - - $136
-
MMBtu
07 2.1222: Install turbulators $3,745 $3,750 - - $3,745
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $14,493 $9,387 $14,087
139,040
kWh
$406
-
kW-mo/yr
-
09 2.7135: Install occupancy sensors $2,620 $243 $2,620
37,973
kWh
- -
10 2.7442: Keep doors and windows shut when not on use $635 - $635
9,205
kWh
- -
11 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $1,423 $840 $1,389
14,978
kWh
$34
-
kW-mo/yr
-
TOTAL RECOMMENDED $107,724 $63,476 $102,082
1,268,257
kWh
$1,761
-
kW-mo/yr
$3,881
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs