ITAC Assessment: WV0502
ITAC logo
ITAC Assessment: WV0502
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Ice cream and yogurt
NAICS 311520: Ice Cream and Frozen Dessert Manufacturing
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $1
M
to 5
M
# of Employees 80
Plant Area 91,000
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 2,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $275,008 4,609,558
kWh
Electricity Demand $202,043 14,022
kW-mo/yr
Natural Gas $35,232 5,516
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,010 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,009

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.4157: Establish a predictive maintenance program $13,685 $1,000 $6,792
113,767
kWh
$9,640
-
kW-mo/yr
- - $(-2,747.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $13,334 $25,930 $8,406
140,800
kWh
$4,928
-
kW-mo/yr
- - -
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $12,681 $18,000 $9,525
159,543
kWh
$3,156
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,838 $20,000 $5,139
86,075
kWh
$1,699
-
kW-mo/yr
- - -
05 2.2621: Modify refrigeration system to operate at a lower pressure $6,333 $2,500 $4,762
79,772
kWh
$1,571
-
kW-mo/yr
- - -
06 2.3212: Optimize plant power factor $3,830 $16,400 - - $3,830 - -
07 2.4151: Develop a repair/replace policy $3,350 $724 $1,711
28,654
kWh
$2,479
-
kW-mo/yr
- - $(-840.0)
08 2.1233: Analyze flue gas for proper air/fuel ratio $1,826 $500 - - - $1,879
-
MMBtu
$(-53.0)
09 2.2511: Insulate bare equipment $812 $2,934 - - - $812
-
MMBtu
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $321 $854 $134
2,246
kWh
$187
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $63,010 $88,842 $36,469
610,857
kWh
$23,660
-
kW-mo/yr
$3,830 $2,691
-
MMBtu
$(-3,640.0)
TOTAL IMPLEMENTED $46,009 $49,942 $26,568
445,010
kWh
$20,390
-
kW-mo/yr
- $2,691
-
MMBtu
$(-3,640.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs