Assessment Year | 2015 |
---|---|
Principal Product | Ice cream and yogurt |
NAICS | 311520: Ice Cream and Frozen Dessert Manufacturing |
SIC | 2024: Ice Cream and Frozen Desserts |
Sales Range | $1 M to 5M |
# of Employees | 80 |
Plant Area |
91,000
ft2
|
Annual Production | 10,000,000
units
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $275,008 | 4,609,558 |
kWh
|
$0.060 |
Electricity Demand | $202,043 | 14,022 |
kW-mo/yr
|
$14.41 |
Natural Gas | $35,232 | 5,516 |
MMBtu
|
$6.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $63,010 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,009 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4157: Establish a predictive maintenance program | $13,685 | $1,000 |
$6,792
113,767
kWh
|
$9,640
-
kW-mo/yr
|
- | - | $(-2,747.0) | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,334 | $25,930 |
$8,406
140,800
kWh
|
$4,928
-
kW-mo/yr
|
- | - | - | |
03 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $12,681 | $18,000 |
$9,525
159,543
kWh
|
$3,156
-
kW-mo/yr
|
- | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,838 | $20,000 |
$5,139
86,075
kWh
|
$1,699
-
kW-mo/yr
|
- | - | - | |
05 | 2.2621: Modify refrigeration system to operate at a lower pressure | $6,333 | $2,500 |
$4,762
79,772
kWh
|
$1,571
-
kW-mo/yr
|
- | - | - | |
06 | 2.3212: Optimize plant power factor | $3,830 | $16,400 | - | - | $3,830 | - | - | |
07 | 2.4151: Develop a repair/replace policy | $3,350 | $724 |
$1,711
28,654
kWh
|
$2,479
-
kW-mo/yr
|
- | - | $(-840.0) | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,826 | $500 | - | - | - |
$1,879
-
MMBtu
|
$(-53.0) | |
09 | 2.2511: Insulate bare equipment | $812 | $2,934 | - | - | - |
$812
-
MMBtu
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $321 | $854 |
$134
2,246
kWh
|
$187
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $63,010 | $88,842 |
$36,469
610,857
kWh
|
$23,660
-
kW-mo/yr
|
$3,830 |
$2,691
-
MMBtu
|
$(-3,640.0) | ||
TOTAL IMPLEMENTED | $46,009 | $49,942 |
$26,568
445,010
kWh
|
$20,390
-
kW-mo/yr
|
- |
$2,691
-
MMBtu
|
$(-3,640.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs