ITAC Assessment: MS0143
ITAC logo
ITAC Assessment: MS0143
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Wood Household Furniture
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 235,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,677 3,011,430
kWh
Electricity Demand $121,273 12,933
kW-mo/yr
Electricity Fees $(-1,314.0) -
Natural Gas $6,554 1,117
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,490 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4314: Use synthetic lubricant $2,471 $825 $591
17,878
kWh
$1,136
-
kW-mo/yr
$(-81.0) - $825
02 2.3132: Recharge batteries on during off-peak demand periods $405 - - $424
-
kW-mo/yr
$(-19.0) - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,411 $1,101 $1,486
44,842
kWh
- $(-75.0) - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,726 $12,791 $4,525
136,577
kWh
$5,093
-
kW-mo/yr
$(-460.0) $(-3,432.0)
-
MMBtu
-
05 2.7261: Install timers and/or thermostats $477 $708 $502
15,240
kWh
- $(-25.0) - -
TOTAL RECOMMENDED $10,490 $15,425 $7,104
214,537
kWh
$6,653
-
kW-mo/yr
$(-660.0) $(-3,432.0)
-
MMBtu
$825
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs