Assessment Year | 2022 |
---|---|
Principal Product | Static metal seals |
NAICS | 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing |
SIC | 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere |
Sales Range | $10 M to 50M |
# of Employees | 171 |
Plant Area |
55,000
ft2
|
Annual Production | 100,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $354,633 | 3,174,060 |
kWh
|
$0.11 |
Electricity Demand | $265,876 | 16,023 |
kW-mo/yr
|
$16.59 |
Electricity Fees | $5,004 | - |
|
- |
Natural Gas | $62,305 | 6,779 |
MMBtu
|
$9.19 |
TOTAL YEARLY COSTS | $687,818 | |||
RECOMMENDED SAVINGS* | $166,178 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,768 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7232: Replace existing hvac unit with high efficiency model | $21,740 | $114,471 |
$7,891
70,645
kWh
|
$738
-
kW-mo/yr
|
$13,111 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,684 | $2,000 |
$6,257
56,016
kWh
|
$1,427
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $322 | $960 |
$264
2,359
kWh
|
$58
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,344 | $200 |
$1,109
9,930
kWh
|
$234
-
kW-mo/yr
|
- | |
05 | 2.9114: Use solar heat to make electricty | $135,088 | $543,322 |
$100,274
897,704
kWh
|
$46,198
-
kW-mo/yr
|
$(-11,383.0) | |
TOTAL RECOMMENDED | $166,178 | $660,953 |
$115,794
1,036,654
kWh
|
$48,655
-
kW-mo/yr
|
$1,728 | ||
TOTAL IMPLEMENTED | $30,768 | $116,671 |
$15,257
136,591
kWh
|
$2,400
-
kW-mo/yr
|
$13,111 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs