ITAC Assessment: UC2202
ITAC logo
ITAC Assessment: UC2202
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Static metal seals
NAICS 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 171
Plant Area 55,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $354,633 3,174,060
kWh
Electricity Demand $265,876 16,023
kW-mo/yr
Electricity Fees $5,004 -
Natural Gas $62,305 6,779
MMBtu
TOTAL YEARLY COSTS $687,818
RECOMMENDED SAVINGS* $166,178 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,768

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7232: Replace existing hvac unit with high efficiency model $21,740 $114,471 $7,891
70,645
kWh
$738
-
kW-mo/yr
$13,111
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,684 $2,000 $6,257
56,016
kWh
$1,427
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $322 $960 $264
2,359
kWh
$58
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,344 $200 $1,109
9,930
kWh
$234
-
kW-mo/yr
-
05 2.9114: Use solar heat to make electricty $135,088 $543,322 $100,274
897,704
kWh
$46,198
-
kW-mo/yr
$(-11,383.0)
TOTAL RECOMMENDED $166,178 $660,953 $115,794
1,036,654
kWh
$48,655
-
kW-mo/yr
$1,728
TOTAL IMPLEMENTED $30,768 $116,671 $15,257
136,591
kWh
$2,400
-
kW-mo/yr
$13,111
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs