ITAC Assessment: IC0247
ITAC logo
ITAC Assessment: IC0247
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Cracker/Biscuit Products
NAICS 311821: Cookie and Cracker Manufacturing
SIC 2052: Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 25
Plant Area 500,000
ft2
Annual Production 7,000,000
units
Production Hrs. Annual 5,214
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $424,293 7,467,595
kWh
Electricity Demand $116,588 15,819
kW-mo/yr
Electricity Fees $139,393 -
Natural Gas $234,400 74,303
MMBtu
TOTAL YEARLY COSTS $914,674
RECOMMENDED SAVINGS* $25,971 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,421

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,735 $1,539 $5,958
104,520
kWh
$1,778
-
kW-mo/yr
-
02 2.4226: Use / purchase optimum sized compressor $2,646 $64,258 $2,373
41,637
kWh
$273
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,752 $1,964 $2,352
41,257
kWh
$1,400
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,040 $5,000 $6,395
112,195
kWh
$1,645
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $1,246 $207 $989
17,348
kWh
$257
-
kW-mo/yr
-
06 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $283 $578 $222
3,906
kWh
$61
-
kW-mo/yr
-
07 2.2437: Recover waste heat from equipment $2,269 $24,850 - - $2,269
-
MMBtu
TOTAL RECOMMENDED $25,971 $98,396 $18,289
320,863
kWh
$5,414
-
kW-mo/yr
$2,269
-
MMBtu
TOTAL IMPLEMENTED $18,421 $70,797 $14,726
258,352
kWh
$3,696
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs