ITAC Assessment: TN0630
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Steel balls
NAICS
n/a
SIC 3562: Ball and Roller Bearings
Sales Range $10
M
to 50
M
# of Employees 59
Plant Area 45,000
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,730 5,252,345
kWh
Electricity Demand $117,148 12,612
kW-mo/yr
Electricity Fees $(-68,466.0) -
Natural Gas $14,432 1,943
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,800 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,800

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 3.6112: Use filter and drying oven to reduce sludge volume $15,740 $48,585 $(-3,360.0)
(-111,958)
kWh
- - - $19,100
-
lb
-
02 3.6193: Install equipment (eg compactor) to reduce disposal costs $59,380 $17,000 $(-2,420.0)
(-80,598)
kWh
- $5,400
-
MMBtu
$56,400
-
Tgal
- -
03 4.431: Train operators for maximum operating efficiency $10,800 $5,900 - - - - - $10,800
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,580 $3,185 $750
24,912
kWh
$1,830
-
kW-mo/yr
- - - -
05 2.7261: Install timers and/or thermostats $300 $485 $300
9,965
kWh
- - - - -
TOTAL RECOMMENDED $88,800 $75,155 $(-4,730.0)
(-157,679)
kWh
$1,830
-
kW-mo/yr
$5,400
-
MMBtu
$56,400
-
Tgal
$19,100
-
lb
$10,800
TOTAL IMPLEMENTED $10,800 $5,900 - - - - - $10,800
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs