Assessment Year | 1998 |
---|---|
Principal Product | Steel balls |
NAICS |
n/a
|
SIC | 3562: Ball and Roller Bearings |
Sales Range | $10 M to 50M |
# of Employees | 59 |
Plant Area |
45,000
ft2
|
Annual Production | 6,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $170,730 | 5,252,345 |
kWh
|
$0.033 |
Electricity Demand | $117,148 | 12,612 |
kW-mo/yr
|
$9.29 |
Electricity Fees | $(-68,466.0) | - |
|
- |
Natural Gas | $14,432 | 1,943 |
MMBtu
|
$7.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $88,800 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,800 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.6112: Use filter and drying oven to reduce sludge volume | $15,740 | $48,585 |
$(-3,360.0)
(-111,958)
kWh
|
- | - | - |
$19,100
-
lb
|
- | |
02 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $59,380 | $17,000 |
$(-2,420.0)
(-80,598)
kWh
|
- |
$5,400
-
MMBtu
|
$56,400
-
Tgal
|
- | - | |
03 | 4.431: Train operators for maximum operating efficiency | $10,800 | $5,900 | - | - | - | - | - | $10,800 | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,580 | $3,185 |
$750
24,912
kWh
|
$1,830
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7261: Install timers and/or thermostats | $300 | $485 |
$300
9,965
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $88,800 | $75,155 |
$(-4,730.0)
(-157,679)
kWh
|
$1,830
-
kW-mo/yr
|
$5,400
-
MMBtu
|
$56,400
-
Tgal
|
$19,100
-
lb
|
$10,800 | ||
TOTAL IMPLEMENTED | $10,800 | $5,900 | - | - | - | - | - | $10,800 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs