1,490
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SF0610 #04 Y:2023 | 04 | 2023 | Heat water with exhaust heat | $36,485 | $30,037 | |
| SF0610 #03 Y:2023 | 03 | 2023 | Use heat from boiler blowdown to preheat boiler feed water | $32,003 | $15,909 | |
| SF0610 #02 Y:2023 | 02 | 2023 | Repair and eliminate steam leaks | $12,954 | - | |
| SF0610 #01 Y:2023 | 01 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $17,215 | - | |
| NL0087 #08 Y:2023 | 08 | 2023 | Utilize energy-efficient belts and other improved mechanisms | $1,019 | $768 | |
| NL0087 #07 Y:2023 | 07 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,789 | $100 | |
| NL0087 #06 Y:2023 | 06 | 2023 | Recover and reuse waste material | $10,817 | $3,660 | |
| NL0087 #05 Y:2023 | 05 | 2023 | Use heat from boiler blowdown to preheat boiler feed water | $11,616 | $7,640 | |
| NL0087 #04 Y:2023 | 04 | 2023 | Use excess cold process fluid for industrial cooling needs | $12,625 | $8,000 | |
| NL0087 #03 Y:2023 | 03 | 2023 | Repair or replace steam traps | $17,666 | $2,000 | |
| NL0087 #02 Y:2023 | 02 | 2023 | Use waste heat from hot flue gases to preheat | $254,315 | $454,461 | |
| NL0087 #01 Y:2023 | 01 | 2023 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $491,419 | $1,990,800 | |
| SF0606 #07 Y:2023 | 07 | 2023 | Use solar heat to make electricty | $112,666 | $923,010 | |
| SF0606 #06 Y:2023 | 06 | 2023 | Preheat boiler makeup water with waste process heat | $7,028 | $31,579 | |
| SF0606 #05 Y:2023 | 05 | 2023 | Install vinyl strip / high speed / air curtain doors | $4,502 | $8,173 | |
| SF0606 #04 Y:2023 | 04 | 2023 | Insulate bare equipment | $5,279 | $5,910 | |
| SF0606 #03 Y:2023 | 03 | 2023 | Insulate bare equipment | $1,107 | $564 | |
| SF0606 #02 Y:2023 | 02 | 2023 | Use minimum steam operating pressure | $5,475 | $60 | |
| SF0606 #01 Y:2023 | 01 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $15,495 | $1,440 | |
| WM0203 #06 Y:2023 | 06 | 2023 | Lower temperature during the winter season and vice-versa | $5,100 | - |