| Assessment Year | 2023 |
|---|---|
| Principal Product | Cheese and Dry Whey product |
| NAICS | 311513: Cheese Manufacturing |
| SIC | 2022: Natural, Processed, and Imitation Cheese |
| Sales Range | $50 M to 100M |
| # of Employees | 400 |
| Plant Area |
320,000
ft2
|
| Annual Production | 277,000,000
lb
|
| Production Hrs. Annual | 7,280
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $2,617,355 | 51,017,315 |
kWh
|
$0.051 |
| Electricity Demand | $807,537 | 83,596 |
kW-mo/yr
|
$9.66 |
| Electricity Fees | $173,452 | - |
|
- |
| Natural Gas | $2,254,017 | 662,623 |
MMBtu
|
$3.40 |
| TOTAL YEARLY COSTS | $5,852,361 | |||
| RECOMMENDED SAVINGS* | $55,671 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $43,430 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4314: Use synthetic lubricant | $16,641 | $45,000 |
$12,699
247,542
kWh
|
$3,942
-
kW-mo/yr
|
- | |
| 02 | 2.3132: Recharge batteries on during off-peak demand periods | $13,369 | $10,160 | - | - | $13,369 | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $8,320 | $13,750 |
$6,349
123,771
kWh
|
$1,971
-
kW-mo/yr
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $7,070 | $1,900 |
$4,530
88,298
kWh
|
$2,541
-
kW-mo/yr
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,171 | $17,500 |
$3,946
76,916
kWh
|
$1,225
-
kW-mo/yr
|
- | |
| 06 | 2.7221: Lower temperature during the winter season and vice-versa | $5,100 | - |
$3,815
74,374
kWh
|
$1,285
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $55,671 | $88,310 |
$31,339
610,901
kWh
|
$10,963
-
kW-mo/yr
|
$13,369 | ||
| TOTAL IMPLEMENTED | $43,430 | $68,910 |
$22,864
445,687
kWh
|
$7,197
-
kW-mo/yr
|
$13,369 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs