ITAC Assessment: HO0053
ITAC logo
ITAC Assessment: HO0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Carpets
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 250,000
ft2
Annual Production 16,200
thousand feet
Production Hrs. Annual 4,590
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $257,026 1,855,217
kWh
Natural Gas $210,341 51,710
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $205,173 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,072

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,063 $8,771 $18,063
130,129
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,598 $6,829 $3,598
26,084
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,514 $6,400 $2,514
18,171
kWh
- -
04 2.4133: Use most efficient type of electric motors $1,255 $2,804 $1,255
9,086
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $2,072 $1,000 $2,072
14,947
kWh
- -
06 2.2136: Install / repair insulation on steam lines $570 $461 - $570
-
MMBtu
-
07 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $168,361 $700,000 $257,061
1,855,217
kWh
$(-47,871.0)
-
MMBtu
$(-40,829.0)
08 2.3212: Optimize plant power factor $8,740 $6,990 $8,740
-
kWh
- -
TOTAL RECOMMENDED $205,173 $733,255 $293,303
2,053,634
kWh
$(-47,301.0)
-
MMBtu
$(-40,829.0)
TOTAL IMPLEMENTED $28,072 $26,265 $27,502
198,417
kWh
$570
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs