| Assessment Year | 1993 |
|---|---|
| Principal Product | Carpets |
| NAICS |
n/a
|
| SIC | 2273: Carpets and Rugs |
| Sales Range | $10 M to 50M |
| # of Employees | 125 |
| Plant Area |
250,000
ft2
|
| Annual Production | 16,200
thousand feet
|
| Production Hrs. Annual | 4,590
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $257,026 | 1,855,217 |
kWh
|
$0.14 |
| Natural Gas | $210,341 | 51,710 |
MMBtu
|
$4.07 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $205,173 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $28,072 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,063 | $8,771 |
$18,063
130,129
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,598 | $6,829 |
$3,598
26,084
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,514 | $6,400 |
$2,514
18,171
kWh
|
- | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $1,255 | $2,804 |
$1,255
9,086
kWh
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $2,072 | $1,000 |
$2,072
14,947
kWh
|
- | - | |
| 06 | 2.2136: Install / repair insulation on steam lines | $570 | $461 | - |
$570
-
MMBtu
|
- | |
| 07 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $168,361 | $700,000 |
$257,061
1,855,217
kWh
|
$(-47,871.0)
-
MMBtu
|
$(-40,829.0) | |
| 08 | 2.3212: Optimize plant power factor | $8,740 | $6,990 |
$8,740
-
kWh
|
- | - | |
| TOTAL RECOMMENDED | $205,173 | $733,255 |
$293,303
2,053,634
kWh
|
$(-47,301.0)
-
MMBtu
|
$(-40,829.0) | ||
| TOTAL IMPLEMENTED | $28,072 | $26,265 |
$27,502
198,417
kWh
|
$570
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs