ITAC Assessment: SF0610
ITAC logo
ITAC Assessment: SF0610
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Whipped cream cans, purity cups (creamers), milk, ice cream mix
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 167,500
ft2
Annual Production 60,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,898,556 17,662,810
kWh
Electricity Demand $1,261,288 30,326
kW-mo/yr
Electricity Fees $22,293 -
Natural Gas $1,859,929 169,695
MMBtu
TOTAL YEARLY COSTS $5,042,066
RECOMMENDED SAVINGS* $256,801 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $138,842

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,215 - $18,335
170,563
kWh
- $(-1,120.0) -
02 2.2135: Repair and eliminate steam leaks $12,954 - - $14,074
-
MMBtu
$(-1,120.0) -
03 2.1243: Use heat from boiler blowdown to preheat boiler feed water $32,003 $15,909 - $32,003
-
MMBtu
- -
04 2.2447: Heat water with exhaust heat $36,485 $30,037 - $36,485
-
MMBtu
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $31,683 $31,050 $31,683
294,724
kWh
- - -
06 2.7135: Install occupancy sensors $8,502 $10,799 $7,441
69,222
kWh
- $214 $847
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $32,191 $83,238 $32,191
299,455
kWh
- - -
08 2.9114: Use solar heat to make electricty $85,768 $772,344 $85,768
797,842
kWh
- - -
TOTAL RECOMMENDED $256,801 $943,377 $175,418
1,631,806
kWh
$82,562
-
MMBtu
$(-2,026.0) $847
TOTAL IMPLEMENTED $138,842 $87,795 $57,459
534,509
kWh
$82,562
-
MMBtu
$(-2,026.0) $847
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs