Assessment Year | 2023 |
---|---|
Principal Product | Whipped cream cans, purity cups (creamers), milk, ice cream mix |
NAICS | 311511: Fluid Milk Manufacturing |
SIC | 2026: Fluid Milk |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
167,500
ft2
|
Annual Production | 60,000,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,898,556 | 17,662,810 |
kWh
|
$0.11 |
Electricity Demand | $1,261,288 | 30,326 |
kW-mo/yr
|
$41.59 |
Electricity Fees | $22,293 | - |
|
- |
Natural Gas | $1,859,929 | 169,695 |
MMBtu
|
$10.96 |
TOTAL YEARLY COSTS | $5,042,066 | |||
RECOMMENDED SAVINGS* | $256,801 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $138,842 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17,215 | - |
$18,335
170,563
kWh
|
- | $(-1,120.0) | - | |
02 | 2.2135: Repair and eliminate steam leaks | $12,954 | - | - |
$14,074
-
MMBtu
|
$(-1,120.0) | - | |
03 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $32,003 | $15,909 | - |
$32,003
-
MMBtu
|
- | - | |
04 | 2.2447: Heat water with exhaust heat | $36,485 | $30,037 | - |
$36,485
-
MMBtu
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $31,683 | $31,050 |
$31,683
294,724
kWh
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $8,502 | $10,799 |
$7,441
69,222
kWh
|
- | $214 | $847 | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $32,191 | $83,238 |
$32,191
299,455
kWh
|
- | - | - | |
08 | 2.9114: Use solar heat to make electricty | $85,768 | $772,344 |
$85,768
797,842
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $256,801 | $943,377 |
$175,418
1,631,806
kWh
|
$82,562
-
MMBtu
|
$(-2,026.0) | $847 | ||
TOTAL IMPLEMENTED | $138,842 | $87,795 |
$57,459
534,509
kWh
|
$82,562
-
MMBtu
|
$(-2,026.0) | $847 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs