ITAC Assessment: CO0128
ITAC logo
ITAC Assessment: CO0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product BABY STROLLERS
NAICS
n/a
SIC 3944: Games, Toys, and Children's Vehicles, Except Dolls and Bicycles
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area
n/a
Annual Production 360,000
pieces
Production Hrs. Annual 4,992
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,703 1,470,106
kWh
Natural Gas $25,979 6,280
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,026 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,053

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $683 $250 - $683
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $963 $250 $963
14,654
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $383 $300 $383
5,862
kWh
-
04 2.7314: Reduce ventilation air $973 $110 $153
2,345
kWh
$820
-
MMBtu
05 2.7261: Install timers and/or thermostats $560 $474 $221
8,499
kWh
$339
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,464 $1,572 $4,464
68,581
kWh
-
TOTAL RECOMMENDED $8,026 $2,956 $6,184
99,941
kWh
$1,842
-
MMBtu
TOTAL IMPLEMENTED $7,053 $2,846 $6,031
97,596
kWh
$1,022
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs