ITAC Assessment: NL0087
ITAC logo
ITAC Assessment: NL0087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Cheese
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $100
M
to 500
M
# of Employees 175
Plant Area 130,000
ft2
Annual Production 81,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $692,689 12,369,450
kWh
Electricity Demand $379,863 22,227
kW-mo/yr
Electricity Fees $344,077 -
Natural Gas $1,792,892 234,059
MMBtu
TOTAL YEARLY COSTS $3,209,521
RECOMMENDED SAVINGS* $809,266 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $491,419 $1,990,800 $1,240,310
9,986,400
kWh
- $(-748,891.0)
-
MMBtu
- - -
02 2.2414: Use waste heat from hot flue gases to preheat $254,315 $454,461 - - $254,315
-
MMBtu
- - -
03 2.2113: Repair or replace steam traps $17,666 $50 - - $19,316
-
MMBtu
- $(-1,650.0) -
04 2.2696: Use excess cold process fluid for industrial cooling needs $12,625 $8,000 $274
4,897
kWh
$12,351
-
kW-mo/yr
- - - -
05 2.1243: Use heat from boiler blowdown to preheat boiler feed water $11,616 $7,640 - - $11,616
-
MMBtu
- - -
06 3.5311: Recover and reuse waste material $10,817 $3,660 - - - $9,900
-
lb
$917 -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,789 $100 $10,489
187,308
kWh
- - - $(-600.0) $(-100.0)
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,019 $768 $718
12,827
kWh
$301
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $809,266 $2,465,479 $1,251,791
10,191,432
kWh
$12,652
-
kW-mo/yr
$(-463,644.0)
-
MMBtu
$9,900
-
lb
$(-1,333.0) $(-100.0)
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs