ITAC Assessment: SF0606
ITAC logo
ITAC Assessment: SF0606
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Pudding
NAICS 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 107
Plant Area 140,000
ft2
Annual Production 28,000,000
lb
Production Hrs. Annual 5,100
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $346,498 3,448,916
kWh
Electricity Demand $96,024 8,446
kW-mo/yr
Natural Gas $213,533 13,587
MMBtu
TOTAL YEARLY COSTS $656,055
RECOMMENDED SAVINGS* $151,552 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,858

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,495 $1,440 $15,495
154,182
kWh
-
02 2.2163: Use minimum steam operating pressure $5,475 $60 - $5,475
-
MMBtu
03 2.2511: Insulate bare equipment $1,107 $564 - $1,107
-
MMBtu
04 2.2511: Insulate bare equipment $5,279 $5,910 - $5,279
-
MMBtu
05 2.7447: Install vinyl strip / high speed / air curtain doors $4,502 $8,173 $4,502
44,796
kWh
-
06 2.2441: Preheat boiler makeup water with waste process heat $7,028 $31,579 - $7,028
-
MMBtu
07 2.9114: Use solar heat to make electricty $112,666 $923,010 $112,666
1,121,052
kWh
-
TOTAL RECOMMENDED $151,552 $970,736 $132,663
1,320,030
kWh
$18,889
-
MMBtu
TOTAL IMPLEMENTED $31,858 $16,147 $19,997
198,978
kWh
$11,861
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs