Assessment Year | 2023 |
---|---|
Principal Product | Pudding |
NAICS | 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing |
SIC | 2026: Fluid Milk |
Sales Range | $50 M to 100M |
# of Employees | 107 |
Plant Area |
140,000
ft2
|
Annual Production | 28,000,000
lb
|
Production Hrs. Annual | 5,100
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $346,498 | 3,448,916 |
kWh
|
$0.10 |
Electricity Demand | $96,024 | 8,446 |
kW-mo/yr
|
$11.37 |
Natural Gas | $213,533 | 13,587 |
MMBtu
|
$15.72 |
TOTAL YEARLY COSTS | $656,055 | |||
RECOMMENDED SAVINGS* | $151,552 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,858 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,495 | $1,440 |
$15,495
154,182
kWh
|
- | |
02 | 2.2163: Use minimum steam operating pressure | $5,475 | $60 | - |
$5,475
-
MMBtu
|
|
03 | 2.2511: Insulate bare equipment | $1,107 | $564 | - |
$1,107
-
MMBtu
|
|
04 | 2.2511: Insulate bare equipment | $5,279 | $5,910 | - |
$5,279
-
MMBtu
|
|
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,502 | $8,173 |
$4,502
44,796
kWh
|
- | |
06 | 2.2441: Preheat boiler makeup water with waste process heat | $7,028 | $31,579 | - |
$7,028
-
MMBtu
|
|
07 | 2.9114: Use solar heat to make electricty | $112,666 | $923,010 |
$112,666
1,121,052
kWh
|
- | |
TOTAL RECOMMENDED | $151,552 | $970,736 |
$132,663
1,320,030
kWh
|
$18,889
-
MMBtu
|
||
TOTAL IMPLEMENTED | $31,858 | $16,147 |
$19,997
198,978
kWh
|
$11,861
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs