Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,490

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Dairy product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0614 #03 Y:2007 Replace existing chiller with high efficiency model $12,870 -
MA0614 #02 Y:2007 Analyze flue gas for proper air/fuel ratio $13,036 $8,400
MA0614 #01 Y:2007 Modify refrigeration system to operate at a lower pressure $16,978 $5,000
MI0142 #06 Y:2006 Reduce the pressure of compressed air to the minimum required $14,779 $30
MI0142 #05 Y:2006 Turn off equipment when not in use $22,540 $850
MI0142 #04 Y:2006 Utilize higher efficiency lamps and/or ballasts $36,407 $68,250
MI0142 #03 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $46,802 $1,074
MI0142 #02 Y:2006 Turn off equipment when not in use $70,674 $34
MI0142 #01 Y:2006 Heat water with exhaust heat $406,657 $46,000
SU0247 #06 Y:2006 Conserve energy by efficient use of vending machines $115 $271
SU0247 #05 Y:2006 Use waste heat from hot flue gases to preheat $32,813 $10,389
SU0247 #04 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $3,403 $572
SU0247 #03 Y:2006 Install / repair insulation on steam lines $3,956 $742
SU0247 #02 Y:2006 Repair and eliminate steam leaks $41,200 $140
SU0247 #01 Y:2006 Reduce the pressure of compressed air to the minimum required $3,479 -
SU0244 #13 Y:2006 Install equipment to utilize waste fuel $1,187,734 $4,100,000
SU0244 #12 Y:2006 Optimize plant power factor $11,590 $30,856
SU0244 #11 Y:2006 Utilize higher efficiency lamps and/or ballasts $448 $356
SU0244 #10 Y:2006 Utilize higher efficiency lamps and/or ballasts $38,277 $20,000
SU0244 #09 Y:2006 Insulate feedwater tank $3,113 $2,058