ITAC Assessment: SU0244
ITAC logo
ITAC Assessment: SU0244
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Dairy Products
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 190,000
ft2
Annual Production 52,000
Tgal
Production Hrs. Annual 7,488
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,620,554 14,295,733
kWh
Electricity Demand $259,189 29,552
kW-mo/yr
Natural Gas $2,597,015 222,663
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,471,752 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $112,070

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $33,798 - $30,254
267,739
kWh
$3,544
-
kW-mo/yr
- -
02 4.821: Pay bills on time to avoid late fees $8,145 - - - - $8,145
03 2.4221: Install compressor air intakes in coolest locations $38,250 $1,066 $34,250
303,096
kWh
$4,000
-
kW-mo/yr
- -
04 2.6218: Turn off equipment when not in use $5,614 - $5,614
49,680
kWh
- - -
05 2.2414: Use waste heat from hot flue gases to preheat $93,478 $10,000 - - $93,478
-
MMBtu
-
06 2.2135: Repair and eliminate steam leaks $16,219 $432 - - $16,219
-
MMBtu
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,070 $1,038 $10,895
96,415
kWh
$1,175
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,016 $5,266 $22,709
200,967
kWh
$307
-
kW-mo/yr
- -
09 2.2123: Insulate feedwater tank $3,113 $2,058 - - $3,113
-
MMBtu
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $38,277 $20,000 $34,032
301,166
kWh
$4,245
-
kW-mo/yr
- -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $448 $356 $218
1,927
kWh
$26
-
kW-mo/yr
- $204
12 2.3212: Optimize plant power factor $11,590 $30,856 - - - $11,590
13 2.1336: Install equipment to utilize waste fuel $1,187,734 $4,100,000 - - $1,187,734
-
MMBtu
-
TOTAL RECOMMENDED $1,471,752 $4,171,072 $137,972
1,220,990
kWh
$13,297
-
kW-mo/yr
$1,300,544
-
MMBtu
$19,939
TOTAL IMPLEMENTED $112,070 $23,884 $75,399
667,247
kWh
$8,990
-
kW-mo/yr
$19,332
-
MMBtu
$8,349
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs