Assessment Year | 2006 |
---|---|
Principal Product | Dairy Products |
NAICS | 311511: Fluid Milk Manufacturing |
SIC | 2026: Fluid Milk |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
190,000
ft2
|
Annual Production | 52,000
Tgal
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,620,554 | 14,295,733 |
kWh
|
$0.11 |
Electricity Demand | $259,189 | 29,552 |
kW-mo/yr
|
$8.77 |
Natural Gas | $2,597,015 | 222,663 |
MMBtu
|
$11.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,471,752 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $112,070 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $33,798 | - |
$30,254
267,739
kWh
|
$3,544
-
kW-mo/yr
|
- | - | |
02 | 4.821: Pay bills on time to avoid late fees | $8,145 | - | - | - | - | $8,145 | |
03 | 2.4221: Install compressor air intakes in coolest locations | $38,250 | $1,066 |
$34,250
303,096
kWh
|
$4,000
-
kW-mo/yr
|
- | - | |
04 | 2.6218: Turn off equipment when not in use | $5,614 | - |
$5,614
49,680
kWh
|
- | - | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $93,478 | $10,000 | - | - |
$93,478
-
MMBtu
|
- | |
06 | 2.2135: Repair and eliminate steam leaks | $16,219 | $432 | - | - |
$16,219
-
MMBtu
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,070 | $1,038 |
$10,895
96,415
kWh
|
$1,175
-
kW-mo/yr
|
- | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $23,016 | $5,266 |
$22,709
200,967
kWh
|
$307
-
kW-mo/yr
|
- | - | |
09 | 2.2123: Insulate feedwater tank | $3,113 | $2,058 | - | - |
$3,113
-
MMBtu
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $38,277 | $20,000 |
$34,032
301,166
kWh
|
$4,245
-
kW-mo/yr
|
- | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $448 | $356 |
$218
1,927
kWh
|
$26
-
kW-mo/yr
|
- | $204 | |
12 | 2.3212: Optimize plant power factor | $11,590 | $30,856 | - | - | - | $11,590 | |
13 | 2.1336: Install equipment to utilize waste fuel | $1,187,734 | $4,100,000 | - | - |
$1,187,734
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $1,471,752 | $4,171,072 |
$137,972
1,220,990
kWh
|
$13,297
-
kW-mo/yr
|
$1,300,544
-
MMBtu
|
$19,939 | ||
TOTAL IMPLEMENTED | $112,070 | $23,884 |
$75,399
667,247
kWh
|
$8,990
-
kW-mo/yr
|
$19,332
-
MMBtu
|
$8,349 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs