ITAC Assessment: SU0247
ITAC logo
ITAC Assessment: SU0247
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Fluid Milk Products
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 62
Plant Area 78,000
ft2
Annual Production 17,000
Tgal
Production Hrs. Annual 7,512
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $473,466 5,754,000
kWh
Electricity Demand $34,615 11,568
kW-mo/yr
Electricity Fees $5,565 -
Natural Gas $410,250 34,526
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,966 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,559

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,479 - $3,251
39,638
kWh
$228
-
kW-mo/yr
-
02 2.2135: Repair and eliminate steam leaks $41,200 $140 - - $41,200
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $3,956 $742 - - $3,956
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,403 $572 $3,215
39,213
kWh
$188
-
kW-mo/yr
-
05 2.2414: Use waste heat from hot flue gases to preheat $32,813 $10,389 - - $32,813
-
MMBtu
06 2.6211: Conserve energy by efficient use of vending machines $115 $271 $115
1,397
kWh
- -
TOTAL RECOMMENDED $84,966 $12,114 $6,581
80,248
kWh
$416
-
kW-mo/yr
$77,969
-
MMBtu
TOTAL IMPLEMENTED $48,559 $1,454 $3,215
39,213
kWh
$188
-
kW-mo/yr
$45,156
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings