ITAC Assessment: MA0614
ITAC logo
ITAC Assessment: MA0614
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Milk, milk by-products, drinks
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $100
M
to 500
M
# of Employees 215
Plant Area 93,500
ft2
Annual Production 43,000
Tgal
Production Hrs. Annual 7,488
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,417,902 12,674,438
kWh
Electricity Demand $88,743 25,284
kW-mo/yr
Electricity Fees $112,272 -
Natural Gas $16,942 1,248
MMBtu
Fuel Oil #2 $385,653 27,872
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,543 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,751

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $16,978 $5,000 $16,978
171,500
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $13,036 $8,400 - - $13,036
-
MMBtu
03 2.2622: Replace existing chiller with high efficiency model $12,870 - $12,870
130,000
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,118 $1,600 $7,118
71,900
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $6,416 $9,000 $6,078
61,400
kWh
$338
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,749 $31,477 $5,445
55,000
kWh
$304
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,376 $20,000 $4,376
44,200
kWh
- -
TOTAL RECOMMENDED $66,543 $75,477 $52,865
534,000
kWh
$642
-
kW-mo/yr
$13,036
-
MMBtu
TOTAL IMPLEMENTED $55,751 $46,477 $42,411
428,400
kWh
$304
-
kW-mo/yr
$13,036
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs