Assessment Year | 2007 |
---|---|
Principal Product | Milk, milk by-products, drinks |
NAICS | 311511: Fluid Milk Manufacturing |
SIC | 2026: Fluid Milk |
Sales Range | $100 M to 500M |
# of Employees | 215 |
Plant Area |
93,500
ft2
|
Annual Production | 43,000
Tgal
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,417,902 | 12,674,438 |
kWh
|
$0.11 |
Electricity Demand | $88,743 | 25,284 |
kW-mo/yr
|
$3.51 |
Electricity Fees | $112,272 | - |
|
- |
Natural Gas | $16,942 | 1,248 |
MMBtu
|
$13.58 |
Fuel Oil #2 | $385,653 | 27,872 |
MMBtu
|
$13.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $66,543 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $55,751 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.2621: Modify refrigeration system to operate at a lower pressure | $16,978 | $5,000 |
$16,978
171,500
kWh
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $13,036 | $8,400 | - | - |
$13,036
-
MMBtu
|
|
03 | 2.2622: Replace existing chiller with high efficiency model | $12,870 | - |
$12,870
130,000
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,118 | $1,600 |
$7,118
71,900
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,416 | $9,000 |
$6,078
61,400
kWh
|
$338
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,749 | $31,477 |
$5,445
55,000
kWh
|
$304
-
kW-mo/yr
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,376 | $20,000 |
$4,376
44,200
kWh
|
- | - | |
TOTAL RECOMMENDED | $66,543 | $75,477 |
$52,865
534,000
kWh
|
$642
-
kW-mo/yr
|
$13,036
-
MMBtu
|
||
TOTAL IMPLEMENTED | $55,751 | $46,477 |
$42,411
428,400
kWh
|
$304
-
kW-mo/yr
|
$13,036
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs